BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Chevy Chase, Maryland. Completed plans call for site work for a road / highway; and sidewalk / parking lot.

The Friendship Heights Village Council, governing body for the Village of Friendship Heights, invites proposals for the installation of rubber speed bumps and repainting white stop bars at Village crosswalks. The successful bidder will be required to execute affidavits of non-collusion, non-conviction, and non-suspension/disbarment (Md. Code, State Finance and Procurement Art. Sec 16-311 (a) and (b)), and a written contract in a form approved by the Village. The successful bidder must be qualified and registered to do business in Maryland (Md. Code, Corps. Art. Sec. 7-201). The Village reserves the right to refuse all bids if none appear appropriate to the Village's circumstances. Contractor to provide and install three (3) rubber speed bumps, measuring 36 inches wide by 45 feet long (the width of the roadway). Each section is 18 inches wide by 3 feet long. Locations of three speed bumps: Two (2) on North Park Avenue between Shoemaker Farm Lane and Willard Avenue One (1) on South Park Avenue between Friendship Boulevard and The Hills Plaza. All speed bumps to cross the full width of the street. Speed bumps to be properly drilled and doweled into the existing pavement with end caps. Traffic control will be required to block off 1/2 of the roadway at a time and to transfer traffic control to the other half to complete installation One (1) at intersection of The Hills Plaza/Somerset Terrace (crossing The Hills Plaza) Four (4) at intersection of The Hills Plaza/South Park Avenue Three (3) at intersection of Friendship Boulevard/North Park Avenue Three (3) at intersection of Friendship Boulevard/South Park Avenue One (1) at intersection of Friendship Boulevard/Willard Avenue (crossing friendship Blvd). Two (2) at intersection of North Park Avenue/Shoemaker Farm Lane One (1) at intersection of North Park Avenue/Willard Avenue (crossing North Park) One (1) at intersection of Shoemaker Farm Lane/Willard Avenue (crossing Shoemaker Farm Lane)

Award

Sidewalks / Parking Lot

$17,446.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
79
Bidding Soon
1,941
All Active Projects
792
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2024

February 19, 2024

img_map_placeholder

Multiple Locations, Chevy Chase, MD

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.