BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a municipal facility in San Leandro, California. Completed plans call for site work for a municipal facility.

To bid on this Project, the Bidder is required to possess the following State of California Contractor Licenses: B Contractors License A bid bond by an admitted surety insurer on the form provided by the County, cash, or a cashier's check or a certified check, drawn to the order of the County of Alameda, in the amount of ten percent (10%) of the total bid price, shall accompany the Bid Form, as a guarantee that the Bidder will, within seven (7) calendar days after the date of the Notice of Award, enter into a contract with the County for the performance of the services as stipulated in the bid. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the contract for the Work The County reserves the right to reject any and all bids and/or waive any irregularity in any bid received. The Alameda County Probation Department (ACPD) Outdoor Recreation Enhancements for the Youth Physical Activities project is a portion of planned, critical improvements to the Alameda County Juvenile Justice Center (JJC), which houses the ACPD Juvenile Hall. In order to create a secure rehabilitation program that meets the specific and individualized needs of the youth and young adults previously housed at the Department of Juvenile Justice, ACPD seeks to create a therapeutic housing environment that includes both indoor and outdoor activity areas for youth and their families to utilize. This project will involve the construction of an outdoor exercise area, including the supply and install of equipment, surfacing and all associated groundworks in accordance with the construction drawings. These improvements are essential to the creation of a mentally, physically, and spiritually rehabilitative space for returning youth and young adults. Question Deadline 12/28/2023

Post-Bid

Municipal

$300,000.00

Public - County

Site Work

13

16

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
89
Bidding Soon
1,875
All Active Projects
785
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2024

February 28, 2024

img_map_placeholder

2500 Fairmont Dr, San Leandro, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.