BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in San Leandro, California. Completed plans call for site work for a water / sewer project.

The party filing the protest must concurrently transmit a copy of the initial protest to the bidder deemed the lowest responsible bidder. The party filing the protest must have actually submitted a bid on the project. A subcontractor of a party filing a bid on this project may not submit a Bid Protest. A party may not rely on the Bid Protest submitted by another bidder, but must timely pursue its own protest. Questions regarding the plans and specifications may be submitted in writing to the project engineer until 5:00 p.m. five (5) business days before bid submittal. The response, if any, will be by written addendum only. Any oral responses do not constitute a revision to these plans or specifications The procedure and time limits set forth in this Section are mandatory and are the bidder's sole and exclusive remedy in the event of a Bid Protest. The bidder's failure to fully comply with these procedures shall constitute a waiver of any right to further pursue the Bid Protest, including filing of a challenge of the award pursuant to the California Public Contract Code, filing of a claim pursuant to the California Government Code, or filing of any other legal proceedings. The City shall review all timely protests prior to formal award of the bid. The City shall not be required to hold an administrative hearing to consider a timely protest, but may do so at the option of the Engineer, or if otherwise legally required. At the time of the City Council's consideration of the award of the bid, the City Council shall also consider the merits of any timely protests and the Engineer's recommendation thereon. The City Council may either accept the protest and award the bid to the next lowest responsible bidder, or reject the protest and award to the lowest responsible bidder. Nothing in this section shall be construed as a waiver of the City Council's right to reject all bids. The City reserves the right to waive any bid irregularities not affecting the amount of the bid, except where such waiver would give the low bidder an advantage or benefit not allowed other bidders. Payment and performance guarantee bonds as set forth: The Engineer has estimated that the value of work is between $2M and $3M The work to be done consists of sanitary sewer point repairs, manhole rehabilitation, CIPP installation and CCTV inspection; and doing all appurtenant work in place and ready for use, all as shown on the plans and described in the specifications with the title indicated A Bid Deposit equal to at least 10% of the total amount of the bid shall be placed in the sealed proposal. The Bid Deposit shall be in one of the following forms: cash, cashiers check or certified check payable to the City, or bidders bond in favor of the City executed by an authorized surety company A Bid Deposit equal to at least 10% of the total amount of the bid shall be placed in the sealed proposal. The Bid Deposit shall be in one of the following forms: cash, cashiers check or certified check payable to the City, or bidder's bond in favor of the City executed by an authorized surety company

Award

Water / Sewer

$1,874,058.00

Public - City

Site Work

14

1

5

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
89
Bidding Soon
1,880
All Active Projects
785
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2021

March 31, 2021

img_map_placeholder

Multiple Locations, San Leandro, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.