BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling of a fire / police facility in Lakeville, Minnesota. Completed plans call for the remodel of a fire / police facility.

The Lakeville Fire Department is remodeling their Fire Station #4 to include 4 dorm rooms, laundry room, and revised kitchen and restroom areas in preparation for future full-time firefighters to live at this station. The bids shall include corporate surety bond, cashier's check, or certified check in an amount equal to five (5%) percent of the base bid and payable to the Owner as a guaranty of the prompt execution of the contract. Contractor shall provide a Performance Bond and Labor and Material Payment Bond for 100% of the Contract Amount. The Owner reserves the right to reject any or all bids, to waive irregularities and informalities therein, and further reserves the right to award the contract in the best interest of the Owner. Bids may not be withdrawn within sixty (60) days after the opening without the consent of the Owner. Documents will be available on or about December 15, 2023, for public inspection at the Owner’s office, Architect’s office, and the following exchanges: Dodge Data and Analytics Construct Connect, 525 Park Street, Suite 110, St. Paul, MN 55103 Minnesota Builders Exchange, 1123 Glenwood Avenue, Minneapolis, MN 55405 Reed Construction Data, Doc Processing Ctr., 30 Technology Pkwy S, #500, Norcross, GA. 30092. The materials, products and equipment described in the Bidding Documents are to be met by bidders. Written requests for approval of substitutions maybe submit by bidders for consideration by the Architect. Requests must be received by the Architect at least seven (7) calendar days prior to the bid date and shall include sufficient data to describe the substitution and any impact it would have on other work. If the Architect approves a proposed substitution, the approval will be indicated in an addendum. No substitutions will be considered after the Contract award unless specifically provided in the Contract Documents.

Award

Fire / Police

$189,000.00

Public - City

Remodeling

26

18

21

3

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
81
Bidding Soon
778
All Active Projects
316
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2024

February 22, 2024

img_map_placeholder

9465 185th St W, Lakeville, MN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.