BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Lakeville, Minnesota. Completed plans call for site work for a water / sewer project.

Said proposals for the furnishing of all labor and materials for the construction, complete in place, of the following approximate quantities: 2,300 LF Lining Sewer Pipe 30" RCP Alternates 365 LF Lining Sewer Pipe 42" RCP Bids will be considered unless accompanied by a certified check, or bid bond made payable to the City of Lakeville for five percent (5%) of the amount bid, to be forfeited as liquidated damages in the event that the bid be accepted, and the bidder fail to enter promptly into a written contract and furnish the required bond. Bid results and tabulations may be viewed Electronically. The Owner reserves the right to reject any and all Bids, waive any informalities in bidding or to accept the Bid or Bids, which best serve the interests of the Owner. No bids may be withdrawn for a period of sixty (60) days from the date of opening of bids. The cost to submit a bid is $25 (plus online payment vendor convenience fee) The City of Lakeville reserves the right to reject any or all bids. CONTRACTOR ACKNOWLEDGEMENTS: (1) Any prime contractor or subcontractor that does not meet the minimum criteria established for a "responsible contractor" as defined in Minn. Stat. 16C.285, subd. 3, or fails to verify that it meets those criteria is not a responsible contractor and is not eligible to be awarded a construction contract for the Project or perform work on the Project. (2) Responsible contractors shall submit to the City a signed statement under oath by an owner or officer verifying compliance with each of the minimum criteria in Minn. Stat. 16C.285, subd. 3, at the time that it responds to this solicitation document. (3) A prime contractor shall submit to the City, upon request, copies of the signed verifications of compliance from all subcontractors. (4) A false statement under oath verifying compliance with any of the minimum criteria shall make the prime contractor or subcontractor that makes the false statement ineligible to be awarded a construction project and may result in termination of a contract awarded to a prime contractor or subcontractor that submits a false statement.

Award

Water / Sewer

$669,650.00

Public - City

Site Work

5

8

2

5

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
81
Bidding Soon
778
All Active Projects
316
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2024

February 19, 2024

img_map_placeholder

To Be Determined, Lakeville, MN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.