BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Shelby, Nebraska. Completed plans call for site work for a swimming pool; and water / sewer project.

The Village of Shelby desires to have the filter system replaced at the swimming pool facility. The work will include the removal of the existing filter system and installation of a new high-rate sand filter system. The Contractor shall remove existing filter system and associated filter pipe. The pump discharge pipe shall be removed from the pump to the filter face pipe. Face pipe, valves and backwash pipe shall be removed. All materials must be disposed of in compliance with State regulations. The Contractor shall provide and install a new high-rate sand filter system per the attached Swimtime or Engineer approved equal. Install new 4" schedule 80 PVC pipe, valves, face pipe, backwash site glass, pressure gauges and other appurtenances in accordance with manufacturer's instructions. Other high-rate sand filter manufacturers may be considered if the other manufacturers filter system meets or exceeds the specifications and warranties of the specified Swimtime filter. All PVC pipe shall be Schedule 80 PVC or CPVC with threaded iron fittings or glued PVC fitting for pipes 3" and smaller and flanged fittings for pipes larger than 3". Flanged fittings shall be used where unions are required in large pipes. Flanges shall be Vanstone Style, Schedule 80 PVC, with ANSI 150-pound standard dimensions, manufacturers Spears or Engineer approved equal. 1. Bolt kits shall be included with flanges. Bolts shall be Type 316 stainless steel. 2. Flange gaskets shall be EPDM. o All butterfly valves shall be positive closing, EPDM seat with phenolic resin hard backing, wafer type butterfly valves with cast iron body and bronze disc, 150 psi shut-off pressure, spring loaded level lock handle for above ground installation. Valves shall be Harvard domestic Model BF8200, Bray Series 30/31 or equal. Valves up to 3" shall be screwed connections and valves 4" or larger shall be mounted between standard 125 lb. companion flanges. Provide and install flowmeter on filter supply pipe from pump. The Flowmeter shall be Model Fv-4 By Flowvis, H2flow Controls.. Provide and install 4" butterfly valve on discharge of the recirculation pump. Verify location with Engineer. Should you have any questions regarding this project, please feel free to contact our office. The Contractor shall inspect the work site and be familiar with the working area and conditions under which the construction will take place. Claims for additional payment will not be considered by the Owner unless the scope of work has been modified.

Award

Swimming Pools

$35,682.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
52
Bidding Soon
487
All Active Projects
229
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 4, 2024

February 5, 2024

img_map_placeholder

To Be Determined, Shelby, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.