BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a pre-engineered storage facility in Burlington, Kentucky. Working plans call for the construction of a 3,200-square-foot pre-engineered storage facility; and for site work for a pre-engineered storage facility.

The Boone County Jail is requesting Proposals from qualified Firms/Contractors for the design/build of a 40' x 80' pre-engineered metal Out building located at the Boone County Jail, 3020 Conrad Lane, Burlington, KY 41005. The approved Firm/Contractor will be responsible for the final design and construction of the structure, including site work, utility work and all aspects of construction. Question Submission Deadline:January 10, 2024, 5:00 pm Question Response Deadline:January 12, 2024, 5:00 pm The anticipated date of completion is June 30, 2024. A Performance Bond in the amount of 100% of the Contract will be supplied by the successful Offeror. Boone County reserves the right to reject any and all proposals, to waive any informalities and to negotiate for the modifications of any proposal or to accept that proposal which is deemed the most desirable and advantageous from the standpoint of customer value and service and concept of operations, even though such proposal may not, on its face, appear to be the lowest and best price. No proposal may be withdrawn for a period of sixty (60) days after scheduled time of receipt of proposals. The Boone County Fiscal Court is an Equal Opportunity Employer. WBE/MBE firms are encouraged to respond to this Request for Proposal. The County reserves the right to reject any and all proposals, and to waive any informality if it is determined to be in the best interest of the County. Shortlist Confirmed.

Final Planning

Warehouse / Distribution - Pre-Engineered Storage Building

$400,000.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
70
Bidding Soon
1,529
All Active Projects
594
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2024

May 16, 2024

img_map_placeholder

3020 Conrad Ln, Burlington, KY

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.