BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 9, 2025 at 8:00 PM

Updated September 10, 2025

Site work, paving and new construction of a mixed-use development in Virginia Beach, Virginia. Design plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

Update:A $19.5 million funding package for Phase 1 of the VB Trail will go toward a 3.2-mile-long, 10-foot-wide paved shared use path that will connect Virginia Beach's western border with Norfolk at Newton Road to Constitution Drive in Town Center. Project is included in City of Virginia Beach Fiscal Year 2026-2031 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- A $19.5 million funding package for Phase 1 of the VB Trail will go toward a 3.2-mile-long, 10-foot-wide paved shared use path that will connect Virginia Beach's western border with Norfolk at Newton Road to Constitution Drive in Town Center. This funding of phase 1 of the VB Trail project will provide a three-mile section of a 10-foot wide paved shared-use path that will connect Norfolk to Virginia Beach Town Center, following the former Norfolk Southern railroad alignment now owned by the City of Virginia Beach. The VB Trail has been in the City of Virginia Beach plans since 1981, and assembling this funding is a great step forward to promote equitable access to a more complete active transportation network, increase pedestrian and bicycle user safety, and spur economic strength and vitality. As of August 11, 2025, this project is in design. Information regarding a bidding timeline and contracting method has not been determined by the owner at this time. A firm timeline of construction has not been reached.

Design

Bridges / Tunnels

$16,429,708.00

Public - State/Provincial

New Construction, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
0
Bidding Soon
393
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2027

Project location map

Multiple Locations, Virginia Beach, VA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.