BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a fire / police facility in Jacksonville, Arkansas. Completed plans call for the construction of a 10,380-square-foot, one-story above grade fire / police facility; and for site work for a fire / police facility.

payable to Wittenberg, Delony & Davidson, Inc. Any required deposit shall be refunded to Bidders who submit a bona fide Bid and return paper Bidding Documents in good condition within ten (10) days after receipt of Bids. The work includes Site Preparation and Improvements, General Construction, Mechanical Work, Plumbing Work and Electrical Work, all to be let under one prime contract. Bid Security: A cashier s check or acceptable bidder s bond payable to the Owner in an amount not less than 5% of the base bid submitted must accompany each bid as a guarantee that, if awarded the contract, the bidder will promptly enter into a contract and execute such bonds as may be required. If a Bid Bond is provided, the Bond must be signed by an authorized agent of the Bonding Company and the agent s power of attorney must be submitted with the Bid Bond. A Bidder receiving a Contract award may retain paper Bidding Documents, and the Bidder s deposit will be refunded. Additional sets or partial sets of Bidding Documents, including addenda, may be obtained for the actual cost of printing, shipping and handling, and will be non-refundable. Prime Bidders may also obtain Bidding Documents in electronic format through Southern Reprographics at Electronically for a non-refundable fee as pre-determined by level of access. No bidder may withdraw his bid within 60 days after the date of the opening thereof. This publication was paid for by the City Attorney s Office of the City of Jacksonville, Arkansas. Each bid must be submitted in a sealed envelope bearing on the outside, the name of the bidder, their Arkansas Contractor License number, their address, and the project name. Bidders, sub-bidders, material suppliers and other interested parties are encouraged to obtain complete sets of Bid Documents from the Architect. Complete sets of Bid Documents should always be used in preparing bids. Neither the Owner nor Architect assumes responsibility for errors in bidding or misinterpretations of Bid Documents resulting from the use of incomplete sets of Bid Documents. The documents obtained through the Architect are considered the official version and take precedence if any discrepancies occur. The use of incomplete or inaccurate Bid Documents does not relieve the bidder of the obligation to perform all work related to his bid as detailed in a complete set of Bid Documents. Pursuant to Arkansas Code Annotated 22-9-203, the Owner encourages all small, minority, and women owned business enterprises to submit bids for capital improvements. Encouragement is also given to all general contractors that in the event they subcontract portions of their work, consideration is given to the identified groups. The Owner reserves the right to waive any formalities in, or to reject any or all bids. All bidders shall conform to the requirements of Arkansas Code Annotated 17-25-101, Arkansas State Licensing Law for Contractors. * The pre-bid meeting originally scheduled for December 28th, has been cancelled and will not be rescheduled. Please contact the architect for any additional information. *

Award

Fire / Police

$3,439,000.00

Public - City

New Construction, Site Work

56

25

13

4

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
21
Bidding Soon
231
All Active Projects
97
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2024

February 12, 2024

img_map_placeholder

900 N Redmond Rd, Jacksonville, AR

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.