BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 30, 2024 at 7:00 PM

Updated January 31, 2024

Site work and paving for a road / highway in San Gabriel, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work generally consists of furnishing all necessary labor, materials, tools, equipment, and other incidental and appurtenant work necessary for the construction of mostly 1.5" thick asphalt rubber hot mix (ARHM) over 2.5" thick conventional AC with a full width 4" thick grind at various locations within the City of San Gabriel. Valley Boulevard section will get a 2" thick ARHM overlay with a full width 2" thick grind. The work shall also include but not necessarily limited to following: edge grinding of existing AC pavement; adjust and install manhole frames and covers at finished grade; restoration of all existing traffic loop detectors, striping, pavement marking and raised markers; all necessary traffic control and public notifications to all adjacent properties to work areas; posting signs for "NO PARKING" and arranging for towing of cars, if necessary; and all other miscellaneous appurtenant work. The bid items, corresponding estimated quantities, and time allowed to complete the work are listed in the Bidder's Proposal and Statement. All required installation and construction shall be performed by the Contractor as specified in the Project Plans, Specifications, Special Provisions and Contract Documents, and/or as directed by the Engineer. Engineer's Estimate - $2.7 million. All questions relative to this project prior to the opening of bids shall be in writing or email and received no later than 4:00 p.m. on Tuesday, January 9, 2024, and shall be directed to: Public Works Project Manager, Alan Mai, at email: amai@sgch.org. The contract is to be executed within 7 calendar days after award of contract by City Council. Time for completion of the work is forty-five (45) working days for all work from the date of the Notice to Proceed.

Award

Roads / Highways

$2,620,182.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
531
Active Projects
254
Bidding Soon
3,760
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 22, 2024

April 1, 2024

Project location map

Multiple Locations, San Gabriel, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.