BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Sheridan, Wyoming. Completed plans call for site work for a water / sewer project.

Schedule 1 includes the replacement of all the ductile iron water mainline for the North Heights Drive & Way section. Construction shall include a total of 2,038 LF of 8" PVC mainline, 56 service connections, 3 connections into 8" mainline, abandonment of the existing main and restoration of all surfacing to original conditions. The contractor will have 50 days to complete the bid option once construction of this section begins. Schedule 2 includes replacement of all ductile iron water mainline for the North Heights Road seciton. Construction shall include a total of 863 LF of 12" PVC mainline, 24 service connections, 2 connections into 12" mainline, abandonment of the existing main and restoration of all surfacing to original conditions. The contractor will have 35 days to complete the bid option once construction of this section begins. Schedule 3 includes the replacment of all ductile iron water mainline for the North Heights Avenue section. Construction shall include a total of 790 LF of 12" PVC mainline, 11 service connections, 2 connections into 12' mainline, abandonment of the existing main and restoration of all surfacing to original conditions. The contractor will have 35 days to complete the bid option once construction of this section begins. Schedule 4 includes replacement of all iron water mainline for the North Heights Court section. Construction shall include a total of 385 LF of 8" PVC mainline, 13 service connections, 1 connection into 8" mainline, abandonment of the existing main and restoration of all surfacing to original conditions. The contractor will have 25 days to complete the bid option once construction of this section begins. Temporary water shall be supplied to residents at all times as well as traffic controls to ensure safe travel of local traffic. Water Main (Repair/Replace) Rehabilitation, Waterlines, Water Utilities, Water/Wastewater Infrastructure, Traffic Control. Questions regarding this project should be addressed to: MC2 Engineering & Construction P.C., Taylor Enger, PHONE: 307-673-7350. ADDRESS: 902 N. Main Street, Sheridan, WY 82801

Award

Water / Sewer

$2,005,814.00

Public - City

Site Work

24

9

6

11

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
5
Bidding Soon
37
All Active Projects
18
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 18, 2024

March 18, 2024

img_map_placeholder

Multiple Locations, Sheridan, WY

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.