Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a civil project in Toccoa, Georgia. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
As of February 21, 2024 the project was awarded to but the awarded amount is not available. The City of Toccoa (Owner) will be requesting Statements of Qualifications from Construction Manager at Risk (CMAR) organizations (Proposers) for the construction of the following Project, and for related pre-construction and procurement CMAR services. The CMAR Contract will include the following services and Work: 1. Rehabilitation of an existing 0.41 MGD conventional wastewater treatment plant plus construction of new unit processes to increase hydraulic peak flow capacity, add primary treatment, and provide onsite solids handling capability. Additionally, CMAR shall provide preconstruction services including constructability review and input, preparation and submission of formal preliminary cost estimates at 30%, 60%, & 90% stages, consultation with Owner and Owner's Advisor on all aspects of planning design and proposed construction. 2. Modify the existing raw sewage pump station 3. Construct new screening & grit structure 4. Construct new flow control structure, flow equalization basin, and transfer pump station 5. Modify the existing aeration basin, secondary clarifiers, & gravity thickener. 6. Modify the existing UV disinfection system 7. Modify the existing WAS pump station 8. Construct new digester and sludge dewatering building 9. Additional items as required for a complete project Owner anticipates that the CMAR's Contract Price will be approximately $12,000,000. The pre-construction services of the CMAR Contract has an expected start date of April 2024 and duration of pre-construction services of 120 days. The Notice to Proceed for construction is expected to occur September 2024 with a duration of 600 days. Final completion of the project is expected to be June 2026. An SOQ will not be considered by the Owner unless the Bidder is on record as having purchased and received complete RFQ/SOQ documents. All prospective Proposers are urged to register with the designated website as an interested party, even if the Proposer has obtained the Proposal Documents from a source other than the designated website. Neither Owner, Owner's Advisor, nor Engineer will be responsible for Proposal Documents, including addenda, if any, obtained from sources other than Electronically. The scope of the CMAR Contract is summarized as follows: 1. Demolition of the existing influentscreening equipment; removal of the existing vertical turbine raw sewage pumps and replacement with submersible chopper pumps; replacement of the existing floating aerators in the aeration basin; hydraulic dredging of the aeration basin; replacement of the drive mechanism for two secondary clarifiers and one gravity thickener; replacement of the WAS pumps; and replacement of the UV disinfection equipment; 2. New construction of an influent flow control structure; 2.0-Mgal. earthen flow equalization basin with geomembrane liner & horizontal floating brush aerators; transfer pump station; grit removal system; sludge digestor with aeration & mixing systems & decanter; sludge dewatering system with sludge feed pump, polymer makeup equipment, discharge conveyor, and dewatering building; 3. Installation of approx. 13,000 LF of 8-inch DI transfer force main; 4. Site improvements necessary for the new construction components including, but not limited to clearing & grubbing, earthwork, yard piping, stormwater piping, asphalt & gravel roads, erosion & sediment control measures, & grassing; 5. Instrumentation, site lighting, electrical, SCADA, & on-site emergency generator; 6. Mobilization/demobilization, bonds, insurance, taxes, royalties, temporary utilities, construction staking, and all other appurtenances necessary for completion of the work.
Award
Water / Sewer
$12,000,000.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 19, 2024
May 20, 2024
Multiple Locations, Toccoa, GA
Related To This Project
Toccoa, GA
Bid Date: Feb 23 2024
Toccoa, GA
Bid Date: Apr 18 2024
Toccoa, GA
Bid Date: Mar 22 2024
Toccoa, GA
Bid Date: Apr 09 2024
Toccoa, GA
Bid Date: May 01 2024
Toccoa, GA
--
Toccoa, GA
Bid Date: Oct 19 2021
Toccoa, GA
Bid Date: Jun 12 2024
Toccoa, GA
Bid Date: Dec 14 2023
Toccoa, GA
Bid Date: Oct 17 2023
Toccoa, GA
Bid Date: Oct 19 2023
Toccoa, GA
Bid Date: Oct 17 2023
Toccoa, GA
Bid Date: Aug 25 2022
Toccoa, GA
Bid Date: Feb 18 2022
Toccoa, GA
Bid Date: Feb 18 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.