Published March 22, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Sayreville, New Jersey. Completed plans call for the renovation of a educational facility.

Hvac Upgrades at Multiple Schools Samsel Upper Sayreville Elementary School Middle School 298 Ernston Road 800 Washington Road Parlin, New Jersey 08859 Parlin, New Jersey 08859 for Sayreville Board of Education 298 Ernston Road Parlin, New Jersey 08859 Bids shall be placed in a sealed envelope with the name of the project clearly marked on the front of the envelope and accompanied by a bid guarantee in the form of a Certified Check, Cashier's Check, or Bid Bond in the amount of Ten Percent 10% of the bid, but not more than $20,000. Due to the Special Nature of the Work Involved That Can Only Be Seen by an in-depth Visitation, the Attendance of All the Bidders is Requested and Strongly Encouraged as an Integral and Important Element of the Bidding Process So That All Bidders Have an Equal Understanding of the Scope of Work Involved. Single-overall Contract Sealed Bid Proposals Shall Be Received as Follows: the Bidder Shall Be Classified by the New Jersey Department of the Treasury, Division of Property Management and Construction (Dpmc) in the Following Trade(S): C032 - Hvacr and C029 - Structural Steel and Ornamental Iron C030 - Plumbing C047 - Electrical Subcontractors Named in the Form of Bid Proposal for Structural Steel, Plumbing, Heating Ventilating and Air Conditioning, and/or Electric, Who Perform Any Work on the Project Must Be Prequalified Prior to the Submission of Bids, Pursuant to the State of New Jersey Division of Property Management and Construction (Dpmc). Each Bid Must Be Accompanied by Proof of Contractor's Dpmc Classification Status. Bidders Are Required to Comply With Requirements of N.j.s.a. 10:5-1 Et Seq., "the Law Against Discrimination," and Affirmative Action, N.j.s.a. 10:5-31 Et Seq. And N.j.ac. 17:27-1 Et Seq. All Bidders and Their Subcontractors Shall Be Registered With the New Jersey Department of Labor and Workforce Development, Pursuant to the Public Works Contractor Registration Act, N.j.s.a. 34:11-56.48 Et Seq. Prior to Award, Bidder Must Provide a Certificate Issued by the New Jersey Department of Labor and Workforce Development, Pursuant to the Public Works Contractor Registration Act, and a New Jersey Business Registration Certificate Issued by the New Jersey Department of Treasury, Division of Revenue for the Bidder and Any Subcontractors Included in the Contractor's Bid. Pursuant to N.j.s.a. 52:32-44, Business Registration of Public Contractors, the Bidder and All Named Subcontractors Must Provide a New Jersey Business Registration Certificate Issued by the New Jersey Department of Treasury, Division of Revenue. If Not Included With the Bid, These Documents Must Be Submitted Prior to Award. the Owner Reserves the Right to Reject All Bids and Waive Any Immaterial Informality in the Bidding Process in Accordance With the Law. The Contract, if Awarded, Shall Be Awarded to the Lowest Responsible Bidder Whose Bid is Responsive in All Material Respects to the Bid Requirements. No Bid Shall Be Deemed Accepted Until the Adoption of a Formal Resolution by the Owner.

Award

Educational

$26,319,000.00

Public - City

Renovation

299

29

44

7

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents, Spare Parts, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation, Lead Remediation
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Cold-Formed Metal Framing, Metal Fabrications, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Exterior Specialties, Manufactured Exterior Specialties, Window Wells
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Furnishings and Accessories, Bedroom Furnishings, Blankets, Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Air Outlets and Inlets, Central Heating Equipment, Heating Boilers, Condensing Boilers, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Ventilators, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 33 - Utilities

Division 33 - Utilities

Utilities, Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Lifting Devices, Clamps, Mobile Plant Equipment, General Vehicles, Carts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
518
Active Projects
274
Bidding Soon
5,248
All Active Projects
2,188
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2024

March 4, 2024

img_map_placeholder

Multiple Locations, Sayreville, NJ

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

HVAC Upgrades at Multiple Schools

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.