BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Ste Genevieve, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Raising Elevation of Stormy Crawford Road. The successful bidder must submit a sworn affidavit and documentation affirming the business entity's enrollment and participation in the federal work authorization program and that all of its employees working for the contracted services are not illegal immigrants. The board of directors reserves the right to reject any and all bids in whole or in part and to waive any irregularities in the best interest of the levee district. The scope of work includes raising the elevation of Stormy Crawford Road and graveling all access ramps on the levee. The board of directors intends to award the contract to the most responsive and responsible bidder submitting the lowest bid. Questions may be directed to levee superintendent Norman Gallup, 636-209-0694 Crown of road shall be level from station 0+00 to about station 20+00 at elevation 378.5 Road surface widened to 18FT. with a 2" crown Material for raising road is available at base of levee Road shall be topped with 3" of V Minus aggregate (approx.. 600 tons) All aggregate placed will need to be compacted to 95% of standard proctor Rock tickets will need to be turned in to the levee district to verify tonnage placed Station 2+48 Remove 24" Culvert Install additional 36" culvert Station 16+00 Extend all 3 - 36" Culverts to the south Pipe installations will be inspected by a levee district representative prior to backfill ACCESS RAMPS Add 2' of 1" minus aggregate to remove rutting in the access ramps Rock tickets will need to be turned in to the levee district to verify tonnage placed All aggregate placed will need to be compacted to 95% of standard proctor Tonnage conversion used for project will be 1.8 tons per CY Levee district has 1 each 20ft. section of 36" CMP and one Connecting band, contractor to provide remainder of pipe. Pipe installations will be backfilled with compacted crushed limestone (No soil or deleterious material allowed.) Culverts will need to be extended to accommodate the additional fill required to meet the new elevation and width

Post-Bid

Roads / Highways

$200,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
35
Bidding Soon
795
All Active Projects
309
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2024

March 14, 2024

img_map_placeholder

Crawford Road, Ste Genevieve, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.