BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Ripley, Tennessee. Completed plans call for site work for a water / sewer project.

Each bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the Instructions for Bidders. An official list of bidders will be maintained Electronically to ensure eligibility requirements of the bidder are met prior to bid opening. Any bid submitted from a bidder not on the official bidders list and/or not containing the above information will not be opened. All Bidders must comply with the applicable provisions of the Contractor Licensing Act of 1994, found in Tennessee Code Annotated, Section 62-6-119, as amended. In Accordance With This Act, the Following Information Must Appear on the Outside of the Envelope Containing the Bid for All Projects in Excess of $25,000: 1. Name of Bidder 2. Address and Phone Number of Bidder 3. Name of Project for Which Bid is Submitted 4. Bidders License Number 5. Expiration Date of License 6. The Portion of Classification of Bidders License That Applies to the Project. The Owner reserves the right to waive any informality or to reject any or all bids. No bidder may withdraw his bid within 90 days after the actual date of the opening thereof. A. The work under this section consists of furnishing all materials, accessories, equipment, tools, transportation, services, labor and performing all operations necessary to completely execute Railroad Crossing work for this project, all as indicated on the drawings, approved shop drawings and as herein specified. B. At highway crossings, all requirements of the State Highway Department shall be met by the Contractor. Lights and barricades of the required number shall be placed to reduce traffic hazards and these shall be maintained until the work is completed. C. At railway crossings, all requirements of the Railroad shall be fulfilled by the Contractor. Lights of the required number shall be maintained at the site. D. All work on railway right-of-way, including any necessary supporting of tracks, shall be under the supervision of the Chief Engineer of the Railway or his authorized representative, who shall be notified at least 15 days before actual work of installation is begun. This work shall be done only in the presence of the authorized representative of the Chief Engineer and no work shall be done or methods used which will, in his opinion, be hazardous in any way to the Railway.

Post-Bid

Water / Sewer

$400,000.00

Public - County

Site Work

3

15

2

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
30
Bidding Soon
447
All Active Projects
185
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2024

February 15, 2024

img_map_placeholder

US-51 & Curve Nankipoo Rd, Ripley, TN


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.