Site work for a water / sewer project in San Francisco, California. Completed plans call for site work for a water / sewer project.

**As of February 13, 2024, this project has not yet been awarded. A timeline for award has not yet been established. This Project is subject to compliance monitoring and enforcement of prevailing wage requirements by the California Department of Industrial Relations ("DIR") and the San Francisco Office of Labor Standards Enforcement. No contractor or subcontractor may be listed in a bid for a public works project and no contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the DIR per California Labor Code Section 1725.5 [with limited exceptions from this requirement for bid purposes only under California Labor Code Section 1771.1(a)]. The objective of the project is to replace aging water facilities which have a history of reoccurring main breaks in order to improve reliability of distribution system and pavement renovation. The Work to be performed under this contract includes the replacement of existing water mains with 8-inch and 16-inch ductile iron pipe on Jersey Street from Douglass to Church Streets, on Diamond Street from 26th to 23rd Streets, on Douglass Street from 25th to 23rd Streets, and on Elizabeth Street from Hoffman Avenue to Castro Street. The work is to be performed in San Francisco, California. The Engineer's estimate is $11,100,000. The contract will be awarded to the responsible Bidder submitting the lowest responsive bid. Bid discounts may be applied as per San Francisco Administrative Code Chapter 14B and Section 2.01 of CM D Attachment 1. The Local Business Enterprise (LBE) subcontracting requirement is 14.00%. The LBE subcontracting requirement can only be met with CM D certified San Francisco Micro and Small-LBEs. The LBE subcontractor participation requirement is set at under 20% in consideration of the fact that the contract includes Contractor procurement of pipeline materials to be installed within the project limits. Pipeline procurement is through a non-LBE supplier and therefore reduces the overall LBE availability on this contract. SFPUC-LBEs cannot be counted towards meeting the LBE subcontracting requirement(s). Prime and Joint Venture level LBE participation cannot be counted towards meeting any of the LBE subcontracting requirement(s). LBE subcontractors must be certified with CM D in the scope of work they are being listed to perform. All Bidders shall submit documented Good Faith efforts with their Bids as directed on CM D Form 2B, except those who exceed the above-stated subcontracting requirement(s) by at least 35%. Refer to CM D Attachment 1. Failure to comply with Chapter 14B requirements may result in a Bid being deemed non-responsive and ineligible for Contract award. Please contact Michelle Kassatly at (408) 641-8031 or michelle.kassatly@sfgov.org for further information. Subcontracting opportunities may include, but not limited, to the following major types of work: trucking, hauling shoring, pavement restoration, saw cutting, and traffic control. In addition, the SFPUC seeks to promote diversity within its contracting opportunities. Thus, the SFPUC strongly encourages bids from Bidders that optimize the use of S.F. Small and Micro-LBE certified subcontracting firms. The SFPUC also seeks to further optimize the use of contractor teams that reflect the diversity of the City and County of San Francisco. As such, the City recommends that Bidders consider the composition of their teams in terms of gender, age, ethnicity, and race, and to utilize teams that include a diverse mix of staff at all organizational levels. When prompted, enter the meeting Passcode and # key. Attendance of remote attendees will be completed at the end of the pre-bid meeting. SFPUC encourages Bidders to complete the Safety Prequalification Web Form at electronically at least 3-weeks prior to the date of Bid opening in accordance with Section 00 21 13 - Instructions to Bidders. Bidders are required to pass the Safety Prequalification prior to SFPUC considering their bid submission complete. SFPUC will notify Bidders that have passed the Safety Prequalification prior to or on the date of Bid opening. Refer to Section 00 21 13 - Instructions to Bidders, "Bidder Qualifications" and the website listed above for additional information. A Class "A" California Contractors License is required to bid. Furthermore, each listed subcontractor must possess appropriate active licenses for the work each subcontractor will be performing. In accordance with San Francisco Administrative Code Chapter 6, the City and County of San Francisco will not accept any offer/bid or award any contract in excess of $1,000,000 until such time as (a) the General Manager of the San Francisco Public Utilities Commission recommends the contract for award and (b) the San Francisco Public Utilities Commission then adopts a resolution awarding the contract. Pursuant to Charter Section 3.105, all contract awards are subject to certification by the Controller as to the availability of funds. Bidders are hereby advised that the Contractor to whom the Contract is awarded must be certified by the Contract Monitoring Division as being in compliance with the Equal Benefits Provisions of Chapter 12B of the City's Administrative Code within two weeks after notification of award by the SFPUC General Manager. This Project is subject to the requirements of the San Francisco Local Hiring Policy for Construction ("Policy") as set forth in Section 6.22(g) and Chapter 82 of the Administrative Code. Bidders are hereby advised that the requirements of the Policy will be incorporated as a material term of any contract awarded for the Project. Refer to Contract Section 00 73 30 for more information. If a Bidder objects on any ground to any bid specification or legal requirement imposed by this Advertisement for Bids, the Bidder shall, no later than the 10th working day prior to the date of Bid opening, provide written notice to the Manager, Contract Administration Bureau, setting forth with specificity the grounds for the objection. 6.30% OBE The Work shall be commenced within 5 calendar days from issuance of the Notice to Proceed by the City, prosecuted diligently thereafter, and brought to Substantial Completion within the time limit of 686 consecutive calendar days beginning with and including the official date of Notice to Proceed. B. Final Completion shall occur no later than 45 consecutive calendar days after the date of Notice of Substantial Completion.

Bid Results

Water / Sewer

$10,202,490.00

Public - County

Site Work

73

20

10

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
336
Active Projects
165
Bidding Soon
3,273
All Active Projects
1,329
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 18, 2024

March 18, 2024

March 1, 2026

img_map_placeholder

Multiple Locations, San Francisco, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.