BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 25, 2024 at 7:00 PM

Updated January 29, 2024

Site work for a military facility in Cherry Point, North Carolina. Completed plans call for site work for a military facility.

This procurement is restricted to the M&R MACC contractors. Only the M&R MACC contractors listed on the RFP cover letter may submit a proposal. See attached documents for scope of work and any applicable drawings. Public Works Project No.: 7299279 Title: Provide Fuel Hose Trench, Bogue Outlying Landing Field NAICS Code and Standard Size: 236220, Commercial and Institutional Building Construction, $45 Million Contract Completion Date: All work shall be completed within 120 calendar days after award. Estimated Cost Range: Between $25,000 and $100,000. Wage Determination: General Decision Number: NC20230065 01/06/2023 Liquidated Damages: $48.00 per Calendar Day Special Scheduling: None Basis for Award: Lowest Price Proposal Acceptance Period: 90 days from receipt of offers Requests for Information (RFIs): RFIs must be submitted to the email addresses above. The cut off for RFIs is 05 January 2024 by 0900 in order to process all inquiries by the proposal due date. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. LOCATION The work is located at Marine Corps Auxiliary Landing Field Bogue, approximately as indicated. The exact location will be shown by the Contracting Officer.

Post-Bid

Military

$100,000.00

Public - Federal

Site Work

8

8

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
37
Bidding Soon
525
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 17, 2024

February 16, 2024

Project location map

To Be Determined, Cherry Point, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.