BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a mixed-use development in Marion, Indiana. Working plans call for the renovation of a medical facility.

VA NORTHERN INDIANA HEALTHCARE SYSTEM MARION CAMPUS PROJECT: 610-22-214 Correct Water Intrusion, Building 8 SCOPE OF WORK: The contractor will provide all labor, equipment, materials, and supervision necessary to install waterproof coving around building 8. This work will include, but not be limited to, excavating, backfilling, repairing/replacing roads, sidewalks, drainage, landscaping, and pavement markings. The Building 8 water intrusion correction shall accommodate the following functions based on the guides, manuals, and planning criteria. Waterproofing the existing Building 8 foundation Installation of drain tile around the perimeter of Building 8. Install storm sewer catch basin and tie into existing storm sewer system Repave parking lot Provide dehumidification controls B. Special items to consider for this project: 1. Field research of conditions of utility systems located under the area of road work All work is to be completed at the VA Northern Indiana Health Care Marion Campus, 1700 E. 38th Street, Marion, IN 46953. Work to be completed within 365 calendar days from notice to proceed. JUSTIFICATION OF WORK: This project is designed to correct the water intrusion at Building 8 at the Marion VA. SAFETY: A. The Contractor shall be thoroughly familiar with all safety rules and regulations. A 30-hour OSHA Competent Person shall be present for all work, and all additional workers shall have a minimum of a 10-hour OSHA Certification. All welders, pipefitters, carpenters, electricians, etc., performing work must present a valid certification for their respectable trade. B. All work associated with this project shall be in compliance with all VA regulations concerning Safety, Infection Control Requirements, Interim Life Safety Measure Requirements, Parking, Personnel Access, and proper removal/safe disposal of construction waste and debris as listed in the specifications and drawings. The Contractor shall abide by all ICRA requirements that are put into place by the VA infection prevention team. The COR shall provide requirements and forms to the Contractor. C. All work will be performed in accordance with ICRA, but it will be the contractor's responsibility to keep the construction areas clean and not damage the existing equipment. If equipment is damaged during the work, the Contractor will be responsible for any required repairs/replacements. SECURITY: A. The contractor, personnel, and subcontractors shall be subject to federal laws, regulations, standards, VA directives, and handbooks regarding information and information system security as delineated in this contract. B. The contractor shall always wear a VAMC badge when they are on VA property. General Contractor s or subcontractor s employees shall not enter the project site without an appropriate badge. Contractor personnel may be subject to inspection of their personal effects when entering or leaving the project site. Before starting work, the General Contractor shall give the COR two weeks notice to provide security arrangements for employee badging. C. Health screenings may be required for those entering VA property, depending on VA directives, federal emergency response, and C DC testing guidelines. Health screeningv may be used in an attempt to identify a potential health impact that may be transferrable to VA personnel or patients before documentable symptoms. If health screening activities are implemented at the Facility Level, the Contractor, their personnel, and their subcontractors must adhere to all Facility directions and guidelines when they are on VA property. Before starting work, the Contractor shall give three days notice to the COR so that current health screening activities at the VA Facility may be identified and communicated to Contractor personnel before mobilization (i.e., restricted entrances, limited delivery windows, etc.).

Final Planning

Medical

$1,000,000.00

Public - Federal

Paving, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
123
Bidding Soon
1,168
All Active Projects
517
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 3, 2024

January 13, 2025

img_map_placeholder

1700 E 38th St, Marion, IN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.