BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 31, 2024 at 8:00 PM

Updated June 18, 2024

Site work for a civil project in Digby, Nova Scotia. Completed plans call for site work for a bridge / tunnel.

1 Replacement of an existing culvert with 27.5m length of new 1500mm diameter concrete culvert, including new bedding gravels, with bentonite / clay subgrade plug at the upstream inlet. Culvert pipe will be supplied to the project site by the Town of Digby. 2 Reinstate all embankments, gravel road shoulders and driveways, and armour stone disturbed during construction. Asphalt paving and guardrail reinstatement will be by others in the future, and is not included in this scope of work. 3 All mass excavation of embankment common, and removal and disposal of existing culvert, road asphalt, and surplus backfill material for the construction of the new indicated culvert. Dispose of removed and surplus material by stockpiling at nearby Digby Public Works Victoria St. yard (approx. 700m from project site). 4 The supply, installation and maintenance of all environmental controls and protection measures required for work on this project. This includes Implementation of Measures to Avoid and Mitigate the Potential for Prohibited Effects to Fish and Fish Habitat, in accordance with the letter issued by Fisheries and Oceans Canada (DFO) to DeWolfe & Morse Surveying Limited, dated December 15, 2023, which is included as part of the Contract Documents. 5 Once substantial performance has been issued, Contractor to complete all deficiencies within 14 calendar days of the Contractor being made aware of the deficiency by the Owner or Consultant. If the Contractor does not repair the deficiency with the 14 calendar day period, the Owner has the right to have outside forces complete the work and deduct the value of this work from the Contract Price. 6 The work is located and described as shown on drawings 2023-210 / Issued for Tender / March 18, 2024 (Revision 5) by DeWolfe & Morse Surveying Limited. 7 Contractor shall obtain all necessary permits to perform the work. 8 All related work, including traffic controls and incidentals associated with the above.

Post-Bid

Bridges / Tunnels

$300,000.00

Public - City

Site Work

4

7

16

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
9
Bidding Soon
225
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2024

June 1, 2024

Project location map

Shore Rd, Digby, NS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.