BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a fire / police facility in Miami, Florida. Completed plans call for the renovation of a fire / police facility.

Contract No: MCC 7360 Plan - CICC 7360-0/08 If you have any questions, contact Rafael Rojas at (786) 331-4513. This RPQ is issued under the terms and conditions of the Miscellaneous Construction Contracts (MCC) Program MCC 7360 Plan. Estimated Value: $405,000 (excluding Contingencies and Dedicated Allowances). 1. Remove and replace existing Fire Alarm Control Panel with addressable type. Manufacturer shall be one of the following: a. Fire Light b. Silent Knight c. Notifier 2. Remove and replace existing fire alarm devices with new fire alarm devices (e.g., smoke detectors, pull stations, duct detectors, sprinkler supervisory devices). Where fire alarm devices do not show as existing and require coverage for protection, the fire alarm device and its required wiring for operation shall be installed. This shall include CO detectors where required as per industry standards. 3. Communication to Central station is required. Fire alarm monitoring services are contracted separately by MDFR and shall not be included in this scope of work. However, coordination is required between contractor and fire alarm central station company to ensure fire alarm system is receiving and sending signals as required by industry standards. Sprinklered fire stations shall have the required devices installed. 4. Existing wiring/cabling to be removed and replaced with new. Existing surface mounted and concealed raceways may remain and be reused for wiring. 5. Required fire alarm signage shall be provided and installed by the contractor. 6. Signed and sealed plans/shop drawings shall be provided by the awarded contractor or contractor's design representative and submitted for review to the appropriate building department having jurisdiction for approval. Permits are required and shall be the responsibility of the awarded contractor. All permit fees shall be the responsibility of the awarded contractor. Inspections shall be coordinated prior to inspection date with MDFR Project manager to ensure access to fire station. 7. Product submittals shall be provided to MDFR Project Manager for review prior to submitting to building department and prior to ordering. 8. Installation of all fire alarm components shall be performed in a professional and workmanlike manner in accordance with the standards of performance considered generally acceptable in the industry for similar tasks and projects. 9. Working hours are Monday to Friday from 8:00 am to 5:00 pm. Weekends and holidays are to be requested in writing 48 hours prior. 10. Contractor to include necessary dumpster as required to comply with the proposed scope of work. Location to be determined and approved by MDFR. 11. MDFR emergency vehicles have the Right-Of-Way at all times. Contractors are not to block or interfere with MDFR daily operations. 12. The work shall be sequenced as necessary to coordinate the work of all subcontractors and suppliers in the most effective manner to diligently complete the work and meet the project schedule as well as the Contract completion deadline. 13. All construction related debris shall be removed by the contractor daily, as construction debris piling WILL NOT be allowed unless properly placed in a construction dumpster. Construction dumpster will be used for loose debris and construction waste materials, unless contractor removes the construction debris daily and immediately after each construction phase. The stations grounds both during and after construction shall be clean of ALL related construction debris including nails, scrap materials, etc. Contractor is responsible and shall include the dumpster(s) and /or debris removal (hauling) as part of their project bid. 14. Storing of material will only be allowed by contractor written request and MDFR Construction written approval. If grounds are used for storing material, equipment, working area, etc., contractor to return grounds to its original conditions, replacing grass, etc. 15. Contractor shall repair & repaint any and all damaged walls caused, as a result of the proposed scope of work at the cost of the contractor, including cost of paint to match existing Fire Station colors. 16. MDFR Fire Rescue Facility is NOT allowed for contractor's use, therefore contractor shall consider portable toilets and other temporary equipment for contractor use. Contractor and their employees are only allowed inside the fire station areas as it pertains to their scope of work. 17. The contractor shall notify MDFR Project Manager of any deviations or conditions encountered which are contrary to those indicated on the project contract drawing document. Failure to make written notifications, shall place responsibility upon the contractor to carry out the work in a satisfactory and workmanlike manner. 18. Contractor shall provide approved temporary chemical toilet facility for his construction crew/employees. The contractor shall be responsible to service clean and maintain such toilet facility. 19. Safety and Security Precautions - All on-site contractor's personnel, shall have identification and or company business attire according to the rules and regulations set by the Miscellaneous Construction Contract 7040-0/07. Contractor shall be responsible for the storage and protection of materials & equipment's. Contractor shall provide barriers/ barricades etc. as necessary to prevent entry and protect construction employees/ personnel. Contractor shall be responsible for all safety precautions and accident preventive provisions of OSHA and all applicable safety codes; Including no claims shall be made against (MDFR) by reason of any act of an employee or trespasser. 20. Manufacturer's disclaimers and limitation on product warranties do not relieve the contractor of the warranty on the work incorporating the products, nor does it relieve suppliers, manufacturers, or subcontractors required to countersign special warranties with the contractor. Estimated Value: $405,000 Calendar Days for Project Completion: 270 The last day for project RFI QUESTIONS is FRIDAY, January 19, 2024 at 5:00 PM. Any questions submitted after aforementioned date shall not be considered. MDFR will review and answer the questions, prior to the bid due date. Any questions pertaining to this project must be submitted in writing to the Project Manager. Please email all questions to: Rafael.RojasJr@miamidade.gov -AND- BENEDIT@miamidade.gov, coping the Clerks of the Board at CLERKBCC@miamidade.go Locations- Station Address Price 1 16699 NW 67 AVENUE, MIAMI LAKES, 33014 4 9201 SW 152 STREET, MIAMI, 33157 7 9350 NW 22 AVENUE, MIAMI, 33147 8 2900 NE 199 STREET, AVENTURA, 33180 11 18705 NW 27 AVENUE, MIAMI, 33056 17 7050 NW 36 STREET, MIAMI, 33166 20 13000 NE 16 AVENUE, MIAMI, 33161 22 15655 BISCAYNE BLVD, MIAMI, 33160 42 65 FISHER ISLAND DRIVE, MIAMI, 33109

Post-Bid

Fire / Police

$405,000.00

Public - County

Renovation

12

3

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
248
Active Projects
123
Bidding Soon
1,764
All Active Projects
746
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 8, 2024

February 26, 2024

November 22, 2024

img_map_placeholder

Multiple Locations, Miami, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.