BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a playground / park / athletic field in Hart, Michigan. Completed plans call for the renovation of a playground / park / athletic field.

The bid was awarded to JAG Construction for $12,190. Construction has begun and will be completed by May 1. Estimated cost is $12k. Major items include: Interior of five (5) 10'x14' shed-style chalets to be finished with R15 and R30 insulation, drywall, paint, floating vinyl flooring, window, door, and base trim The successful contractor agrees that if their submittal is accepted by the Hart Economic and Redevelopment Team (HEART), they will, within fifteen (15) calendar days of the Notice of Award, enter into a contract to furnish all labor, equipment and material necessary to completely execute the work for the pricing stated in their proposal. The successful contractor shall also supply to HEART liability insurance documentation with the City of Hart, Hart Economic and Redevelopment Team as a named insured. The work associated with this program cannot not commence prior Notice of Award and must be completed no later than May 1, 2024. All work must comply with local, county and state codes. Contractor shall be responsible for acquiring and paying for all permits required for this project. HEART reserves the right to accept or reject any proposal, to waive any irregularities in any proposal and to negotiate with a selected contractor if it appears such actions would be in the best interest of the City of Hart Scope of work: Insulate, drywall, paint, and install floating vinyl flooring with base trim in five (5) 140 square foot (10'x14') chalets at the Main Street Market in Downtown Hart. Specifications: Interior of each unit to be finished with R13 wall insulation, R30 ceiling insulation, 1/2 " finished drywall on walls and ceiling, satin white painted ceiling and walls, and 1x4" painted white trim around (15) 2'x3' windows, (5) 3'x5' doors and (5) 14'x10' baseboards.

Under Construction

Playgrounds / Parks / Athletic Fields

$12,190.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
23
Bidding Soon
338
All Active Projects
149
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2024

March 7, 2024

img_map_placeholder

206 E Main St, Hart, MI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.