Site work, paving and outdoor lighting for a mixed-use development in Pompano Beach, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for outdoor lighting for a road / highway.
The Improvements under this Contract consist of , but are not limited to, monitor existing structures (inspection and settlement, vibration), MOT (standard, traffic control officer, arrow board, PCMS, pedestrian LCD, temporary signalization, temporary traffic detection), protections (sediment barrier, inlet, tree), earthwork (excavation, embankment), asphalt (driveway maintenance, turnouts, milling, resurfacing), concrete (removal, curb and gutter, curb, traffic separator, sidewalk, driveways, ditch, gravity wall), rail (bullet rail, aluminum pipe handrail), bridge (expansion joint rehab, polymer nosing), pavement markings (detectable warnings, RPM, painted, thermoplastic, bike lane), signing (panel F&I, panel relocate, panel remove, singlecolumn F&I, singlecolumn relocate, single-column remove, multi-column F&I, reflective strip, tubular marker, object marker), signalization (signal cable, aluminum pole F&I, aluminum pole remove, ped signal F&I, ped signal remove, ped detector F&I, ped detector remove, controller cabinet), lighting (luminaire F&I, pole complete, conductors, load center, cable distribution system), electrical service (power, wire, disconnect), conduit, pull/splice box, TMS (sensor, inductive loop, cabinet F&I, cabinet remove), drainage (inlets), utilities adjustments (manhole, valve box, meter box), and sod along State Road 845 (Powerline Road) from State Road 870 (Commercial Boulevard) to South Palm Aire Drive, for 2.069 miles in The Cities of Fort Lauderdale and Pompano Beach, Broward County Project Number - D423085B Counties: Broward Road Name: SR 845 (Power Rd) Limits: From S Sr 870 (Commercial Blvd) to N of S Palm Aire Dr Project(s): 44619615201(*) Federal Aid No: D423085B Project(s): 44619615202 Federal Aid No: D423085B Project(s): 44619615203 Federal Aid No: N/A Total Roadway Length: 2.040 Miles Total Bridge Length: 0.029 Miles Total Proposal Length: 2.069 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Days Description: The Improvements under this Contract consist of , but are not limited to, monitor existing structures (inspection and settlement, vibration), MOT (standard, traffic control officer, arrow board, PCMS, pedestrian LCD, temporary signalization, temporary traffic detection), protections (sediment barrier, inlet, tree), earthwork (excavation, embankment), asphalt (driveway maintenance, turnouts, milling, resurfacing), concrete (removal, curb and gutter, curb, traffic separator, sidewalk, driveways, ditch, gravity wall), rail (bullet rail, aluminum pipe handrail), bridge (expansion joint rehab, polymer nosing), pavement markings (detectable warnings, RPM, painted, thermoplastic, bike lane), signing (panel F&I, panel relocate, panel remove, singlecolumn F&I, singlecolumn relocate, single-column remove, multi-column F&I, reflective strip, tubular marker, object marker), signalization (signal cable, aluminum pole F&I, aluminum pole remove, ped signal F&I, ped signal remove, ped detector F&I, ped detector remove, controller cabinet), lighting (luminaire F&I, pole complete, conductors, load center, cable distribution system), electrical service (power, wire, disconnect), conduit, pull/splice box, TMS (sensor, inductive loop, cabinet F&I, cabinet remove), drainage (inlets), utilities adjustments (manhole, valve box, meter box), and sod along State Road 845 (Powerline Road) from State Road 870 (Commercial Boulevard) to South Palm Aire Drive, for 2.069 miles in The Cities of Fort Lauderdale and Pompano Beach, Broward County Question Deadline 01/24/2024 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order 022 - Resurfacing, Lighting and Traffic Signals
Award
Roads / Highways
$5,469,442.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 31, 2024
February 10, 2024
Powerline Rd, Pompano Beach, FL
Related To This Project
Pompano Beach, FL
--
Pompano Beach, FL
--
Pompano Beach, FL
--
Pompano Beach, FL
Bid Date: Feb 28 2024
Pompano Beach, FL
Bid Date: Apr 02 2024
Pompano Beach, FL
--
Pompano Beach, FL
Bid Date: Mar 12 2024
Pompano Beach, FL
Bid Date: Mar 13 2024
Pompano Beach, FL
Bid Date: Jan 31 2024
Pompano Beach, FL
--
Pompano Beach, FL
Bid Date: Jan 09 2024
Pompano Beach, FL
Bid Date: Feb 07 2024
Pompano Beach, FL
--
Pompano Beach, FL
--
Pompano Beach, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.