Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Marysville, Washington. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
The Grove Street Overcrossing Project will construct an arterial roadway overpass, replacing an at-grade railroad crossing that will span the Burlington Northern Santa Fe (BNSF) Railway mainline railway track on Grove Street from State Avenue to Cedar Avenue. This overpass will address all modes of traffic and will include three travel lanes, bicycle lanes and pedestrian sidewalks. The challenges this Project seeks to address include frequent blockages of east-west traffic with resulting network congestion, serious injuries from train-vehicle collisions, emergency response delays by police and fire services, intermodal inefficiencies, disconnected community, and noise and air pollution. Benefits will include improved public safety, transportation network efficiency, and reduced social and environmental impacts. Both Marysville and Washington State are deeply committed to this project, with $5 million from the 2022 Move Ahead WA, $3 million from the Community Project Funding via Representative Rick Larsen’s office, and local funds allocated to the Design and Right-Of-Way process. The Project will complete PE and ROW in 2025 to begin construction in 2026. As of January 12, 2024, this project is included in the City of Marysville's 2023-2024 Capital Improvement Program (CIP). It is anticipated construction will start in 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$8,000,000.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2026
Grove St, Marysville, WA
Related To This Project
Marysville, WA
Bid Date: Jun 27 2024
Marysville, WA
--
Marysville, WA
Bid Date: Jan 23 2024
Marysville, WA
Bid Date: Mar 05 2024
Marysville, WA
Bid Date: Apr 02 2024
Marysville, WA
Bid Date: Apr 17 2024
Marysville, WA
Bid Date: Jan 26 2024
Marysville, WA
Bid Date: Jan 04 2024
Marysville, WA
--
Marysville, WA
--
Marysville, WA
--
Marysville, WA
Bid Date: Jun 29 2022
Marysville, WA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.