BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Layton, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Counties: Monroe Road Name: Sr 5 (Us 1/overseas Hwy)- SR 5 (US 1/OVERSEAS HWY) FROM MM 108.4 TO MM 112.8 Limits: From Mm 108.4 to Mm 112.8 Project(s): 44600515201(*) Federal Aid No: D623025B Total Roadway Length: 5.189 Miles Total Bridge Length: 0.013 Miles Total Proposal Length: 5.202 Miles Contract Days: 450 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 30 Days Description: Pavement Smoothness/incentive/disincentive the Improvements Under This Contract Consist of Resurfacing Along Sr 5/us-1/overseas Highway From Mm 108.4 to Mm 112.8 in Monroe County. Question Deadline 01/24/2024 at 5:00 PM Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00. A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order 026 - Resurfacing and Base Work - Pavement Smoothness/Incentive/Disincentive THE IMPROVEMENTS UNDER THIS CONTRACT CONSIST OF RESURFACING ALONG SR 5/US-1/OVERSEAS HIGHWAY FROM MM 108.4 TO MM 112.8 IN MONROE COUNTY At the locations where median barrier is being replaced, the intent is to change the median barrier wall to the current standard single slope style median barrier. New single slope median barrier connection to the existing barrier should be per Standard Plans 521-001. Proposal Budget Estimate: $21,449,757.00

Award

Roads / Highways

$18,895,663.00

Public - State/Provincial

Paving, Site Work

303

3

2

8

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
9
Bidding Soon
425
All Active Projects
170
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2024

April 1, 2024

img_map_placeholder

FL-5, Layton, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.