Site work and paving for a road / highway in Flagstaff, Arizona. Completed plans call for site work for a road / highway; and for paving for a road / highway.
As of March 12,2024, this project has not yet been awarded. A timeline for award has not yet been established. This is a one-step qualifications-based selection process as authorized by ARS 34-601 through 34-612. An evaluation committee shall select, in order of preference and based on the criteria established, a list of firms deemed to be qualified to provide the services required. The selection of the short list must be based on demonstrated competence and qualifications only. Fees, price, man-hours, or any other cost information may not be considered in the selection of the shortlist. If a short list is selected, interviews of the top selected firms may be conducted and then negotiations may commence for a contract with firm(s) for the required services. The negotiations shall include consideration of compensation and other contract terms and conditions the County determines to be fair and reasonable. In making this determination, the County shall take into account the estimated value, the scope, complexity and nature of the required services. Project Description Coconino County is seeking Statements of Qualifications (SOQs) for Construction Manager at Risk ("CMAR") services for the Stardust Trail Widening & Reconstruction Project (Project) within Coconino County, Arizona. The County intends to secure CMAR pre-construction and construction services for this project for Spring/ Summer of 2024. Substantial completion by June 30, 2024, would be ideal but Contractor may propose alternative schedule within Summer 2024. The Stardust Trail Widening & Reconstruction Project is part of the Coconino County Public Works 10-year Capital Improvement Plan and funded through Proposition 403 (County Road Maintenance Sales Tax). The purpose of the project is to address the aging pavement section and improve shoulders to allow for safer roadway recovery zones and multimodal use along roadway. The project corridor spans approximately 1.5 miles from Yancy Lane to McGee Rd and resides within the Doney Park residential community. The scope of work in the corridor can be described in three sections: South segment (Yancey Ln to Silver Saddle Rd) - pavement crack repair and surface treatment (fog seal) - Approx 0.5 miles. Middle segment (Silver Saddle Rd to Neptune Dr) - pavement reclamation with paved shoulder widening - Approx 0.5 miles. North segment (Neptune Dr to McGee Rd) - mill and overlay with paved shoulder widening - Approx 0.5 miles. The County intends to award one contract to the highest qualified firm after all proposals are evaluated and negotiations completed. The construction project estimate is between 2-3 million dollars. Proposers will have civil construction challenges typical to high elevation regions as found in Coconino County. The elevation and seasonal challenges present in the County include large elevation and climate range differences. The successful firm selected for this project is expected to have significant demonstrated ability and experience in both the type of work required and the construction of projects in colder, low to high elevation altitude climates with a limited construction season. It is also expected that the selected firm be experienced in working in residential areas; access to private properties shall be maintained at all times. The anticipated construction season for the work is from April through June. It is critical that the Respondent provide detailed information regarding its resources (equipment and staffing) to complete the Project on schedule. Any Proposer may withdraw their Proposal at any time prior to the closing time. Details of each proposal, including proposed fees, shall not be announced at the time of opening. Such information shall be made public after all negotiations are completed and an award made. All Proposals may be rejected if the Board determines that rejection is in the public interest. The County reserves the right to waive any informalities in accepting and evaluating Proposals. Question Deadline 01/24/2024. Questions regarding the Scope of Work received less than five (5) business days before the Proposal due date may not be answered. Any interpretation or correction of the proposed documents will be made only by addendum. Coconino County is not responsible for any other explanations or interpretations of the proposed documents. Any clarifications or interpretations of this RFQ that materially affect or change the scope or intent will be issued via addenda and posted electronically. Oral statements or clarifications shall be non-binding and without legal effect. It is the responsibility of all respondents to check electronically periodically for addenda and to obtain this information in a timely manner. Any proposer objecting to the recommendation of award, rejection of a proposal, solicitation procedures of an RFQ, or any portion thereof, must submit a written protest to the Purchasing Office. This protest must be submitted prior to the Board of Supervisors meeting at which the recommendation is on the agenda for award or rejection. The protest must be filed with the Purchasing Office within three business days from notification of the recommendation. A complete description of the protest procedures may be found in the County Purchasing Policy located on electronically. The purpose of this meeting will be to clarify the contents of this RFQ and provide an opportunity for questions regarding the RFQ or the project. Point-of-Contact: The County designates the following person as its representative and Point-of-Contact for this RFQ. Respondents shall restrict all contact with the Public Works Department. Scott Richardson, CPPO Purchasing Manager 928-679-7191 email: srichardson@coconino.az.gov After the award is made, the Point-of-Contact person will be: Charles Wilson, PE, CFM Civil Engineer Coconino County Public Works Department 928-606-8813 email: chwilson@coconino.az.gov Tentative time frames Evaluation and Selection February 12th, 2024 Short List Interviews (if scheduled) February 19th, 2024 Award of Contract March 5th, 2024 Construction Manager achieves Substantial Completion by June 30, 2024 Upon award of the construction contract/amendment, the Independent Contractor will provide 100% payment and performance bonds for the amount of the GMP. The County reserves the right to reject any proposal that takes exceptions or proposes alternate language unacceptable to the County. Proposals shall be submitted via Coconino County online purchasing platform, Ion Wave Technologies, to https://coconino.ionwave.net on or before the day and hour set for the opening of Proposals in the published notice.
Post-Bid
Roads / Highways
$2,500,000.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 31, 2024
March 6, 2024
Stardust Trail, Flagstaff, AZ
Related To This Project
Flagstaff, AZ
Bid Date: Jan 10 2024
Flagstaff, AZ
Bid Date: Feb 15 2024
Flagstaff, AZ
Bid Date: Feb 02 2024
Flagstaff, AZ
Bid Date: Mar 19 2024
Flagstaff, AZ
--
Flagstaff, AZ
Bid Date: Apr 07 2021
Flagstaff, AZ
--
Flagstaff, AZ
Bid Date: Apr 04 2024
Flagstaff, AZ
Bid Date: Jan 26 2024
Flagstaff, AZ
Bid Date: Feb 09 2024
Flagstaff, AZ
Bid Date: Jan 17 2024
Flagstaff, AZ
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.