BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Saint Louis, Missouri. Completed plans call for the construction of a power facility; for site work for a power facility; transportation facility; and transportation facility.

The City of St. Louis, Board of Public Service, is seeking Statements of Qualifications for providing Design Services for a New West Central Utility Plant (also called CUP) and Electrical Substation at St. Louis Lambert International Airport. The City of St. Louis, Board of Public Service, is seeking Statements of Qualifications for providing Design Services for a New West Central Utility Plant (also called CUP) and Electrical Substation at St. Louis Lambert International Airport. The existing Climate Control West (CCW) Facilities were originally built in 1956 and dates back to the original construction of the airport. Many systems in the facility are aged, antiquated, and obsolete with various systems within the facility having reached or nearing the end of their service life. Airport maintenance is having increasing difficulty obtaining replacement parts. Furthermore, as the airport expanded, additional equipment was squeezed into the existing building. Replacement of the equipment would require expansion of the buildings and site to meet current code requirements, however, there is no room for expansion at the existing site. As a result, relocation to a new facility, to be referred to as the New West Central Utility Plant (CUP), is necessary. The existing Climate Control West Facilities would be replaced with a new Central Utility Plant (CUP) to serve existing Terminal 1, and if it is built, the future Consolidated Terminal Program (CTP) and miscellaneous nearby support buildings. In addition, the existing CCW Facility has underground storage tanks that contain heating oil. The proposed CUP would replace the old underground tanks with new above ground storage tanks for heating oil, if there were an interruption or planned outages to the natural gas service. The Airport is supplied natural gas by a transportation gas agreement, and it is anticipated that this will continue with new and relocated Airport facilities General Scope Design a New West Central Utility Plant and Electrical Substation to meet current and future needs of the Airport. The design includes work related to Federal, State, and Local guidelines, Authority Having Jurisdiction (AHJ), Federal Aviation Administration (FAA) requirements, and Airport standards. Architectural, Engineering, and Planning services to be performed on the following project: A) Design Service Scope 1) Design Consultant's Services shall include basic services for all disciplines required to complete design of the project and construction administration. Basic services should include, but are not limited to the following: i. Program verification, planning and concept designs including the development of standards for new building connections to the new CUP and Substation systems. ii. All Architectural programming and design services including ADA, code compliance, and sustainability programming including LEED Certification. Sustainability program shall include sustainability charettes and related analysis and recommendations to determine goals and opportunities for the new CUP and Substation as well as a future goals for existing and/or the potential Consolidated Terminal buildings and structures. Sustainability tracking and record keeping to be maintained by others and supported by the Consultant. iii. Interior Design iv. Civil Engineering Design Grading and related utility design (including coordination with Spire for natural gas and Ameren for electricity, or other providers as appropriate) Boundary surveys or other related services to create, modify, add or vacate easements for utility providers Connecting and operational pavement design Storm water management analysis and design Building foundation and site retaining wall design including geotechnical engineering Site security (fencing and gating) and related controls Phased construction including maintenance of traffic, as appropriate All questions shall be directed to Helen Bryant, Board of Public Service, by e-mail at bryanth@stlouis-mo.gov

Post-Bid

Transportation Terminals

$50,000,000.00

Public - City

New Construction, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
98
Bidding Soon
1,457
All Active Projects
641
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 31, 2025

March 31, 2025

img_map_placeholder

10701 Lambert International Blvd, Saint Louis, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.