BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Wheaton, Illinois. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

RFP Engineering - Route 38 Pedestrian Bridge. Should the Firm consider that a change in the Scope of Work, the Agreement sum, or delivery date is required; he/she shall initiate a change order and submit to the Project Manager for documented approval before proceeding with the work. Inquiries and/or questions pertaining to the provisions and specifications of this proposal package shall be directed to the Procurement Officer, in writing at twalters@wheaton.il.us. Questions will be accepted until January 16, 2024, at 11:00 am (CST). Questions will be answered via addendum and posted to the City's website at electronically. Contract Negotiations. The Director of Engineering and Assistant City Manager will negotiate with the firms. The Director of Engineering or Assistant City Manager reserves the right to delegate responsibility to the Procurement Officer or Senior Project Engineer. Violation; liability for unpaid wages; liquidated damages. In the event of any violation of the clause set forth in paragraph 5(A) of this section, the Contractor, and any subcontractor responsible therefor shall be liable for the unpaid wages. In addition, such contractor and subcontractor shall be liable to the United States, for liquidated damages. Project Administration. The City procedures require the assigned project manager to monitor work on the project in accordance with the contract and to file reports with the Director of Engineering. The City's procedure requires evaluation of the consultant's work at the end of the project. INSURANCE Insurance is required as listed in this RFP package. The City reserves the right to reject any and all offers in whole or in part according to the best interests of the City. The City reserves the right to make changes to the Scope of Work by altering, adding to, or deducting from the work, without invalidating the Agreement. All such changes shall be executed under the conditions of the original Agreement.

Conceptual

Bridges / Tunnels

$171,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
167
Active Projects
87
Bidding Soon
1,752
All Active Projects
757
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2025

img_map_placeholder

IL-38, Wheaton, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.