Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 3, 2024 at 7:00 PM

Updated February 2, 2024

This is a service / maintenance or supply contract in Springfield, Massachusetts. Contact the soliciting agency for additional information.

Pioneer Valley Transit Authority (PVTA), through its service operator, SATCo, is seeking proposals from qualified contractors to provide Overhead Door Preventative Maintenance Inspections and Testing. There are three locations where work will be performed: 665 Cottage St., Springfield MA, 2840 Main St., Springfield MA, and 54 Industrial Dr., Northampton MA. The contract shall be for a period of three years. All inquiries should be directed to Karolina Szocik KSzocik@pvtransit.com by no later than Wednesday, January 17th before 2:00 PM. Further information can be obtained from Karolina Szocik, SATCo Purchasing Supervisor, KSzocik@pvtransit.com. The Authority reserves the right to cancel this solicitation at any me prior to execution of the Contract by all pares and without any liability against the Authority. The Proposer must specify all costs and fees to be charged as well as response times to provide the services as stated in this RFP. Cost information shall be completed for each service year: 3/1/2024 - 2/28/2025 3/1/2025 - 2/28/2026 3/1/2026 - 2/28/2027

Post-Bid

Municipal

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
906
Active Projects
398
Bidding Soon
6,137
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2024

March 1, 2024

Project location map

Multiple Locations, Springfield, MA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed