BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 4, 2024 at 7:00 PM

Updated January 29, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Custer, South Dakota. Working plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Solicitation Number: 140L0624R0025 Project Identification: GAOA South Dakota Bridge Replacements Design/Build Point of Contact: Vicki Meier, Contract Specialist, vmeier@blm.gov Project Locations: o Horse Camp Bridge: 44.377703 LAT and -103.46547 LONG o Englewood Bridge Site: 44.3205 LAT and -103.76889 LONG Magnitude of Construction: Between $500K - $1M Estimated Period of Performance: 210 calendar days after issuance of the notice to proceed North American Industry Classification System (NAICS) Code: 237310 - Highway, Street, and Bridge Construction Produce Service Code: Y1LB - Construction of Highways, Roads, Streets, Bridges, and Railways Small Business Size Standard: $45M Solicitation Set-Aside: None - Full and Open Competition Solicitation Issuance Date: The BLM anticipates issuing a subsequent request for proposals (RFP) in late January 2024. Proposal Submission Deadline: Exact date unknown at this time / 30-days after the issuance of the RFP (Phase one deadline). Registration Requirements: Perspective offerors must have a Unique Entity ID (UEI) and an active System for Award Management (SAM) profile to included completed representations and certifications. https://sam.gov/content/home Site Visit: Yes - Approximately 2-3 weeks after the issuance of the RFP. Refer to FAR provision 52.236-27 within the subsequent solicitation. Site Visit Location: BLM Alkali Creek Campground (42.37556 LAT, -103.46739 LONG) which is 0.1 miles east on BLM - Horse Soldier Road off Interstate 90 Exit 34 near Sturgis, South Dakota. Project Description: The subject requirement consists of all labor, materials, equipment, supplies, and supervision to design and construct two bridges. The project includes all abutments, riprap abutment protection, and roadways and to install appropriately designed steel bridges. The contractor is responsible for performing a survey, geotechnical investigation, hydraulic analysis, and structural load rating for the structure. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Bridges / Tunnels

$1,000,000.00

Public - Federal

Demolition, New Construction, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
12
Bidding Soon
209
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2024

Project location map

Multiple Locations, Custer, SD

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.