BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Colorado Springs, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Reference Number 0000338708 Sinton Trail South Douglas Creek Repairs The Contractor shall complete all work within 100 Calendar Days after the Notice to Proceed. Buyer Preferences, Guidelines & Requirements General Requirements - Insurance Required Bonding Requirements Buyer Requires E-Bonding - Bid Bond 5 % Question Acceptance Deadline 01/17/2024 01:00 PM MT Questions are submitted online No, All questions must be submitted in writing to the following Contracts Specialist All questions must be submitted via email and must be received no later than Contract Specialist Name Mike Zeller Contract Specialist Email michael.zeller@coloradosprings.gov Estimated Project Magnitude: $900,000.00 - $1,500,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *The City reserves the right to reject any or all Bids and to waive informalities and/or irregularities in a Bid. Whether or not a contract is awarded as a result of this Invitation for Bid, as stated above, Bid preparation costs are not reimbursable.

Bid Results

Roads / Highways

$987,914.00

Public - City

Paving, Site Work

18

9

76

4

Subscribe For Documents

147 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
31
Bidding Soon
738
All Active Projects
312
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2024

April 1, 2024

img_map_placeholder

Sinton Trail, Colorado Springs, CO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.