Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published February 16, 2024 at 7:00 PM
Updated February 17, 2024
Site work for a water / sewer project in Gladstone, Oregon. Completed plans call for site work for a water / sewer project.
Evergreen Lane Storm Drain Project. This Project Will Involves the Replacement of 393 Feet of Failed 18" Storm Line, Which is the Last Segment of the Storm water Conveyance System Contributing to The Evergreen Lane Storm water Outfall, Which is Currently Severely Obstructed by a Large Tree. The Project Will Also Involve the Installation of Maintenance Access Manholes and a Relocation of the Outfall to a Conveniently Accessible Location Where It May Flow Freely. Temporary Protection & Direction of Traffic, One-Call and Pothole Existing Utilities, Clearing and Grubbing Removal and Replacement of Topsoil, Removal of Pavement, Curbs, Driveways, and Sidewalks All Restoration and Cleanup Storm Drainage Improvements- 18 Inch HDPE Pipe, 18 Inch Ductile Iron Pipe , Install Concrete Manhole provided by City, Removal of Existing Pipes, Connection to Existing Structures, Drainage Berm Embankment, Rip rap outfall pad Street Improvements - Resurfacing - A.C. Pavement , Resurfacing - Driveway Rock Surfacing If you have any questions, please contact this department at 503-656-7957. Addenda From These Meetings, if Any Will Be Provided No Later Than the End of Business on February 1, 2024 to Any and All Registered Planholders. COMMENCEMENT DATE: Shall occur following Issuance of Notice to Proceed ("NTP") but not prior to March 13, 2024 Substantial completion shall be no later than July 1, 2024 or within 90 business days from the start of Work, final completion shall be no later July 19, 2024.
Award
Water / Sewer
$114,091.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed