Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 16, 2024 at 7:00 PM
Updated February 17, 2024
Site work for a water / sewer project in Gladstone, Oregon. Completed plans call for site work for a water / sewer project.
Evergreen Lane Storm Drain Project. This Project Will Involves the Replacement of 393 Feet of Failed 18" Storm Line, Which is the Last Segment of the Storm water Conveyance System Contributing to The Evergreen Lane Storm water Outfall, Which is Currently Severely Obstructed by a Large Tree. The Project Will Also Involve the Installation of Maintenance Access Manholes and a Relocation of the Outfall to a Conveniently Accessible Location Where It May Flow Freely. Temporary Protection & Direction of Traffic, One-Call and Pothole Existing Utilities, Clearing and Grubbing Removal and Replacement of Topsoil, Removal of Pavement, Curbs, Driveways, and Sidewalks All Restoration and Cleanup Storm Drainage Improvements- 18 Inch HDPE Pipe, 18 Inch Ductile Iron Pipe , Install Concrete Manhole provided by City, Removal of Existing Pipes, Connection to Existing Structures, Drainage Berm Embankment, Rip rap outfall pad Street Improvements - Resurfacing - A.C. Pavement , Resurfacing - Driveway Rock Surfacing If you have any questions, please contact this department at 503-656-7957. Addenda From These Meetings, if Any Will Be Provided No Later Than the End of Business on February 1, 2024 to Any and All Registered Planholders. COMMENCEMENT DATE: Shall occur following Issuance of Notice to Proceed ("NTP") but not prior to March 13, 2024 Substantial completion shall be no later than July 1, 2024 or within 90 business days from the start of Work, final completion shall be no later July 19, 2024.
Award
Water / Sewer
$114,091.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 7, 2024
March 13, 2024
Evergreen Ln, Gladstone, OR
Related To This Project
Gladstone, OR
Bid Date: Feb 21 2024
Gladstone, OR
Bid Date: Apr 03 2019
Gladstone, OR
Bid Date: Apr 02 2024
Gladstone, OR
Bid Date: Mar 27 2024
Gladstone, OR
Bid Date: May 22 2025
Gladstone, OR
--
Gladstone, OR
Bid Date: Aug 26 2025
Gladstone, OR
--
Gladstone, OR
Bid Date: Mar 16 2022
Gladstone, OR
Bid Date: Mar 04 2022
Gladstone, OR
Bid Date: Feb 11 2022
Gladstone, OR
Bid Date: Feb 11 2022
Gladstone, OR
Bid Date: Jan 04 2022
Gladstone, OR
Bid Date: Jul 26 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
