BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Stockton, California. Completed plans call for site work for a bridge / tunnel.

Project Type Bid Response Types Line Items Bid Bond Envelope A: Document 00 41 13 Bid Form - Stipulated Sum (required) Envelope A: Document 00 41 16 Schedule of Quantities and Prices (required) Envelope A: Document 00 43 13 Bid Bond (required) Envelope A: Document 00 43 16 Bidder's Declaration (required) Envelope A: Document 00 43 36 List of Subcontractors (required) Envelope A: Document 00 45 19 Non-Collusion Affidavit (required) Envelope A: Document 00 45 51 State Debarment and Suspension Certification (required) Envelope A: Document 00 45 53 Agreement to Comply with California Labor Law Requirements (required) Envelope A: Document 00 45 54 Statement Acknowledging Penal & Civil Penalties Concerning the Contrac (required) Envelope B: Document 00 45 13 Bidder's Responsibility Statement (required) Type of Award Lump Sum Categories 423390 - Other Construction Material Merchant Wholesalers 423510 - Metal Service Centers and Other Metal Merchant Wholesalers 238110 - Poured Concrete Foundation and Structure Contractors 238120 - Structural Steel and Precast Concrete Contractors 238910 - Site Preparation Contractors 238990 - All Other Specialty Trade Contractors 90638 - General Construction 91200 - Construction Services, General License Requirements A and/or B California Contractor's license. Liquidated Damages $4,500/day Start/Delivery Date Work shall be commenced within ten (10) calendar days. Project Duration 240 calendar days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% SJRRC reserves the right to revise or amend the IFB or specifications up to the time set for opening the bids. Such revisions and amendments, if any, shall be issued by addenda to this solicitation. Copies of such addenda shall be posted via PlanetBids and a notification sent to all prospective Bidders of the IFB. In the event that an addendum sets forth material changes, additions or deletions is issued when there is seventy-two (72) hours or less to the bid opening date and, pursuant to Public Contract Code section 4104.5., SJRRC will extend the bid opening date by no less than three (3) business days. Clarification notices that do not significantly impact the Bidders ability to submit a bid shall not result in an extension of the bid opening date. The Construction of the Lathrop Wye Box Culvert would consist of a double-barrel reinforced cast-inplace concrete box culvert. The Lathrop Wye Box Culvert functions as an irrigation drainage ditch for farms receiving SSJID irrigation water and as a storm drain for approximately 10,210 acres of land in south Manteca and several regional municipalities. The culvert crossing is needed to support new wye connection tracks, which will curve over a portion of the canal. The tracks will be constructed as a part of a future, separate project. The double-barrel concrete box culvert would have dimensions approximately 384 feet long, 30 feet wide, and 11 feet tall. Concrete wing walls and an apron would be constructed at the culvert's inlet and outlet. In addition, riprap and rock slope protection would be placed around both ends of the culvert to protect canal slopes and soil from erosion attributable to concentrated runoff. It is anticipated that all earthwork could be conducted with most equipment staged on the bank rather than be placed in the dewatered canal. Temporary shoring or sloping of banks along the canal would be required during culvert construction to prevent bank failure The culvert work area would need to be isolated and dewatered prior to construction. In addition, culvert construction would require a temporary water diversion system so that the construction area can be dewatered without disrupting irrigation and stormwater drainage. A temporary bypass line would be installed to divert water around the culvert work area, likely to the east of the canal away from the existing railroad tracks. A temporary bypass pump would be installed upstream of the southern cofferdam to pump water out of the canal and around the work area, which would then outfall north of the downstream cofferdam. Erosion protection would be placed at the temporary outfall location. The temporary bypass pumping plan would be approved by SSJID prior to construction and would include information on the cofferdam design, pump calculations, and pipe design SJRRC reserves the right to waive any informality or irregularity and to reject any and all bids CONTRACTOR'S LICENSE: Contractor shall possess an A and/or or B California Contractor's license, valid and in good standing, at the time of award of the Contract.

Award

Bridges / Tunnels

$6,895,600.00

Public - County

Site Work

58

16

19

6

Subscribe For Documents

79 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
390
Active Projects
185
Bidding Soon
3,469
All Active Projects
1,446
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 5, 2024

April 5, 2024

img_map_placeholder

Multiple Locations, Stockton, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.