EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 4, 2024 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Columbia, Missouri. Completed plans call for the renovation of a educational facility.

Contractor shall complete the project and provide all labor, materials, and equipment necessary for completion of the project. The scope of work for the project shall consist and includes all work necessary and identified in the District's Invitation to Bid and all other Attachments attached to and incorporated into this Agreement. The scope of work shall be performed in accordance with this Agreement. The project shall be referred to throughout the remainder of this Agreement as the "Work". All Work under this Agreement shall be done by Contractor in compliance with all applicable local, county, state, and federal laws, codes, ordinances, and regulations. The Contractor shall be solely responsible for obtaining all necessary building permits, licenses and other documents to perform the Work. Contractor shall pay all governmental charges and inspection fees necessary for the prosecution of the Work which are applicable at the time this Agreement is executed. In the event of any inconsistency or conflict between provisions of this Agreement and the provisions of any documents referenced and attached hereto, then at the option of the District, the stricter shall prevail and control. Requests for interpretation (RFI) or clarifications of the Bidding Documents shall be submitted by the Bidder in writing no later than 12:00 pm local time on January 16, 2024. Bidders shall submit RFIs in PDF format to Brad Stegemann via email at stegemann@soa-inc.com. Gentry Middle FACS Classroom Renovation Inquiries or questions about the bid or specifications: Ms. Lisa Ozanich, Assistant Purchasing Agent E-mail lozanich@cpsk12.org All questions or requests shall be submitted in writing. Replies may be issued by addendum. All Contractors and Subcontractors shall conform to the State of Missouri, Division of Labor Standards, Annual Wage Order No. 30, Section 010, Boone County, in accordance with Section 290.262 CUM. Supp. RSMo 2000. All Contractors and Subcontractors shall conform to the Missouri Prevailing Wage Law Sections 290.550 to 290.580 Public Works during Excessive Unemployment, if applicable to this Project. The Owner reserves the right to reject any or all Bids and to waive informalities or irregularities in the bidding.

Award

Educational

$357,000.00

Public - City

Renovation

19

15

10

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Construction Layout, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Starting and Adjusting, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Architectural Woodwork, Architectural Wood Casework
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Vapor Retarders
Division 08 - Openings

Division 08 - Openings

Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Acoustical Panel Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Wall and Door Protection
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Countertops, Furnishings and Accessories, Rugs and Mats, Runners
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Storm Drainage, Roof Drains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Site Clearing, Earth Moving, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
37
Bidding Soon
273
All Active Projects
160
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2024

February 13, 2024

img_map_placeholder

4200 Bethel St, Columbia, MO


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Gentry Middle FACS Classroom Renovation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.