EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 14, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Minneapolis, Minnesota. Completed plans call for site work for a water / sewer project.

**As of March 14,2024 has not yet been awarded. A timeline for the award has not yet been established.** Rehab of Sanitary Manholes with Poly Coating Questions due by: 3:30 PM, 1/12/2024 This specification shall govern all work, materials, equipment, and incidentals required for 100% solids polyurethane coating rehabilitation for the purpose of eliminating infiltration, exfiltration, providing corrosion protection, and repair of voids by applying the lining system to the wall and bench surfaces of brick, concrete, or other masonry construction material. There are 129 sanitary sewer manholes that will be rehabilitated by means of the polyurethane coating system, for a total of 1540 vertical feet of liner. Manhole dimensions shall be verified in the field. Generally, the manholes are circular or oval-shaped brick with a 30-inch diameter The City of Minneapolis policy is to provide equal opportunities to all businesses, with an effort to redress discrimination in the Citys marketplace and in public contracting against MinorityOwned Business Enterprises (MBEs) and Women-Owned Business Enterprises (WBEs). The SUBP, as detailed in the Minneapolis Code of Ordinances Chapter 423.40, applies to contracts in excess of $,000. SUBP goals are set on contracts based on project scope, subcontracting opportunities, and availability of qualified MBEs/WBEs.

Bid Results

Water / Sewer

$1,078,935.00

Public - City

Site Work

5

6

2

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
66
Bidding Soon
859
All Active Projects
449
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2024

May 1, 2024

img_map_placeholder

To Be Determined, Minneapolis, MN

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.