Demolition and site work for a municipal facility in Hot Springs National Park, Arkansas. Completed plans call for the demolition of a municipal facility; and for site work for a municipal facility.

This is the preferred method of submittal. This invitation does not constitute an order for the service/product named. DEMOLITION, REMOVAL, AND CLEARING: 1. Except as otherwise provided herein, all buildings and structures including retaining and foundation walls, steps, piers, and other artificial objects and obstructions shall be completely razed and removed to a depth of at least one foot below ground level. 2. Wells, cisterns, cesspools, outdoor toilets, basements, cellars, septic tanks, etc., and holes and trenches resulting from demolition and removal shall be filled to the ground surface. Rock materials from masonry construction may be used in the backfilling up to a depth of one foot below theground surface if sufficient fine materials are mixed therewith to fill the voids. Underground tanks are to be removed and the areas filled. Dirt shall be used for the top one (1) foot of the backfill. For rough grading, rock materials from masonry construction with a maximum dimension of nine inches may be used in all except the top one foot of the fill, provided such rock and materials are well distributed in the earth. All fill material shall be free from trash, wood, pipe, and debris. 3. The Contractor shall, after clearing the property, grade and clear the property so as to allow for complete run-off of surface water and ensure that there are no broken boards, rock, concrete, masonry pieces, or debris of any kind that would prevent or hinder mowing of the property. The property shall be left in a hazard-free condition. All detached accessories or outbuildings shall not be removed unless otherwise instructed by the City. 4. Masonry walls shall be demolished in small sections. Structural steel, cast iron, and heavy timbers shall be removed by individual pieces and lowered carefully. All floor construction over basements and cellars shall be removed, regardless of elevation.

Award

Municipal

$3,500.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
14
Bidding Soon
270
All Active Projects
108
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 5, 2024

March 5, 2024

img_map_placeholder

To Be Determined, Hot Springs National Park, AR

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.