BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and outdoor lighting for a road / highway in Berwyn, Illinois. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

The Contractor shall (1) furnish all labor and provide materials to maintain the respective installations in first class working order and operating condition at all times; (2) make permanent repairs to damaged equipment; (3) clean, repair, and overhaul specified equipment at stated intervals of time; (4) provide the necessary transportation for workmen, materials, and equipment used to execute the work under the terms of the Contract; and (5) GIVE TWENTYFOUR (24) HOUR MAINTENANCE AND REPAIR SERVICE, INCLUDING SATURDAYS, SUNDAYS, AND HOLIDAYS to correct any malfunction of equipment or effect any temporary emergency repairs to damaged equipment resulting from any cause. All calls are to be considered as emergencies. The Contractor shall be required to patrol the respective installations for lamp outage and other non-operative equipment once every two (2) weeks. Written inspection logs shall be included with each monthly invoice. Also, upon notification by the Director of Public Works of the City of Berwyn or his duly authorized representative, the Contractor shall be required to correct any malfunctioning equipment that is reported within the allowable timeframe specified elsewhere in these Special Provisions. MFT Traffic Signal & Light Maintenance Site Directions: See Spec & Plans Servicing & Maintaining Traffic Signals Installations & Street Lighting System throughout various locations in Berwyn

Award

Roads / Highways

$357,586.00

Public - City

Outdoor Lighting, Site Work

3

3

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
178
Active Projects
83
Bidding Soon
1,754
All Active Projects
714
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 17, 2024

February 1, 2024

img_map_placeholder

Multiple Locations, Berwyn, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.