BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Okatie, South Carolina. Completed plans call for site work for a water / sewer project.

The Beaufort Jasper Water & Sewer Authority (BJWSA) hereby requests your consideration in submitting a Bid to perform replacement of Air Release Valve assemblies (ARV) at various BJWSA sites. Questions Due Date: Jan 19th 2024, 4:00 PM EST Questions submitted via online portal. Replacement of Air Release Valve assemblies (ARV) as listed below and in Cost Tabulation. Locations of ARVs to be replaced are shown in attached BJWSA GIS exhibits and as-builts located in Appendix A. Work shall include removal of the existing ARV from manhole vault, replace existing tapping saddle with new SS316 tapping saddle, removal of manhole cone and backfill with select BJWSA approved fill material and installation of new contractor supplied ARV pedestal per BJWSA Technical Specification S-25. New ARV to be placed upon 3x3 concrete pad no less than 6 above ground surface. Any required shutdown shall be coordinated with BJWSA staff and a shutdown plan shall be submitted to BJWSA by the Contractor. Contractors are encouraged to make site visits for accurate quantities of required items described above. BJWSA will assist with site access. Contact the project manager (Kathryn Couch: kathryn.couch@BJWSA.org) for a nonmandatory pre-bid site visit.

Bid Results

Water / Sewer

$97,959.00

Public - State/Provincial

Site Work

9

3

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
47
Bidding Soon
525
All Active Projects
248
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 25, 2024

March 25, 2024

img_map_placeholder

Multiple Locations, Okatie, SC

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.