BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Santa Rosa, California. Contact the soliciting agency for additional information.

Engineering - Alternatives Evaluation and Engineering Design Services for LTP Cathodic Protection Improvements Project. Start/Delivery Date April 2024. There are four cathodic protection (CP) systems installed at multiple locations at Laguna Treatment Plant that help maximize underground pipe network service life by preventing corrosion. Two of the four CP systems at the LTP are not operational. The third system, installed in 1974 with a rectifier replacement in 1996, was operational but found inadequate for corrosion protection. Per Carollo's Cathodic Protection Testing Results and Recommendations, dated November 29, 2012 the three CP systems need to be evaluated and based on findings either rehabilitated or replaced. Consultant shall submit a proposal and a fee estimate with rate schedule that describes the scope of services to be provided. The scope of work for each task, as described in Section II, will be organized into the following four phases. Reference Projects: The proposal shall include a list of at least three (3) recent projects completed by your firm with similar services to those required by this RFP. Include a project description, contact name and number, design fee, construction dates, construction estimate, and final construction cost. Scope of Services: The proposal shall include a detailed scope of services identifying specific tasks and any specific considerations and assumptions. See item IV Scope of Services above. The City of Santa Rosa Water Department operates and maintains the Laguna Treatment Plant (LTP) for treating wastewater and distributes recycled water through the reclamation system. LTP provides wastewater treatment for the cities of Santa Rosa, Rohnert Park, Sebastopol, and Cotati and the South Park Sanitation District (Regional Partners). LTP produces disinfected tertiary recycled water as defined by Title 22 of the California Code of Regulations, has an average daily dry weather flow of 15.5 million gallons per day (mgd). The peak daily wet weather capacity is 67 mgd. The method of Contractor Selection has not been Determined at this time. Event Bid description: To be considered, the proposal, rate schedule, and fee estimate must be submitted to the City by either of the following methods: A PDF file via email to the Contact Person listed below (with rate schedule and fee estimate in a separate PDF file), or Three (3) hard copies of the proposal (with rate schedule and fee estimate in a separate sealed envelope) Send all proposal materials to the City's project manager: Tanya Mokvyts, P.E., Santa Rosa Water, 4300 Llano Rd, Santa Rosa, CA 95407 (707) 529-3101 TMokvyts@srcity.org

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
246
Active Projects
123
Bidding Soon
2,392
All Active Projects
940
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 3, 2025

img_map_placeholder

Multiple Locations, Santa Rosa, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.