BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 27, 2024 at 7:00 PM

Updated February 28, 2024

Site work and paving for a mixed-use development in Sedalia, Missouri. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The work consists of the installation of storm sewers, curb and gutter, driveway repair, water main replacement, erosion control, and all incidental and/or related work as necessary to provide a complete project. All questions shall be submitted in writing to Elizabeth Nations (ENations@cityofsedalia.com) via email a minimum of seven (7) days prior to the bid opening. Responses shall be issued as an addendum following the question deadline. MBE (10%), WBE (6.9%)

Award

Water / Sewer

$232,630.00

Public - City

Paving, Site Work

15

6

4

6

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
85
Bidding Soon
843
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2024

April 8, 2024

Project location map

Multiple Locations, Sedalia, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.