BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Leesville, Louisiana. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Asphalt Overlay (Level 1 Non-Polymer): labor, equipment, and materials to lay prime coat, 1 hot mix asphalt, Level 1 Non-Polymer asphalt overlay on 12 22 wide road on prepared base and existing asphalt, price per ton with suitable wearing coarse; 5% over run; five (5) day time limit in Vernon Parish from January 1, 2024 to December 31, 2024. Widening of intersections and turnouts MUST be priced as part of the road. Must meet LADOTD specifications. No minimum tonnage required per job. Contractor to respond and perform within five (5) days of notice from Vernon Parish Police Jury. Asphalt on all prepared bases shall be completed by October 31, 2024 unless otherwise authorized by the Parish Road Manager. The Vernon Parish Police Jury reserves the right to reject any or all bids Asphalt on all prepared bases shall be completed by October 31, 2024 unless otherwise authorized by the Parish Road Manager. 1. 1.5" Asphalt Overlay (Level 1 Non-Polymer): labor, equipment, and materials to lay prime coat, 1 1/2 " hot mix asphalt, Level 1 Non-Polymer asphalt overlay on 12' - 22' wide road on prepared base and existing asphalt, price per ton with suitable wearing coarse; 5% over run; five (5) day time limit in Vernon Parish from January 1, 2024 to December 31, 2024. Widening of intersections and turnouts MUST be priced as part of the road. Must meet LADOTD specifications. No minimum tonnage required per job. Contractor to respond and perform within five (5) days of notice from Vernon Parish Police Jury. 2. 2" Asphalt Overlay (Level 1 Non-Polymer): labor, equipment, and materials to lay prime coat, 2" hot mix asphalt, Level 1 Non-Polymer asphalt overlay on 12' - 22' wide road on prepared base and existing asphalt, price per ton with suitable wearing coarse; 5% over run; five (5) day time limit in Vernon Parish from January 1, 2024 to December 31, 2024. Widening of intersections and turnouts MUST be priced as part of the road. Must meet LADOTD specifications. No minimum tonnage required per job.Contractor to respond and perform within five (5) days of notice from Vernon Parish Police Jury. 3. Chip Seal: labor, equipment, and materials to lay sections of level and chip seal with washed granite/rhyolite Hatton Tuff over existing blacktop, 12' - 22' wide road from January 1, 2024 to December 31, 2024. No minimum on square yardage required per job. Must meet LADOTD specifications. Contractor to respond and perform within five (5) days of notice from Vernon Parish Police Jury. 4. Lime Conditioning for Gravel or Asphalt Roads: Furnish labor, equipment, and material delivered to site to stabilize heavy clay with hydrated lime, depth and percentage to be determined by qualified laboratory on 12'-22' wide Gravel or Asphalt Road base 5% over run. The top 8-12 inches deep of all roads must be reclaimed before placing Lime Conditioning from January 1, 2024 to December 31, 2024. Widening of intersections and turnouts MUST be priced as part of the road. Must meet LA-DOTD specifications. No minimum tonnage required per job. Contractor to respond and perform within five (5) days of notice from the Vernon Parish Police Jury. 5. Soil Cement Base Material for Gravel or Asphalt Roads: Furnish labor, material, and equipment delivered and distributed at site, to stabilize the existing road, percent by volume of Portland cement to be determined by a qualified laboratory, cut in on 12' - 22' wide Gravel or Asphalt Road base 5% over run primed and ready for asphalt, price per square yard, If Lime is not required the top 8-12 inches deep of all roads must be reclaimed before placing soil cement from January 1, 2024 to December 31, 2024. Must meet LADOTD specifications. Contractor to respond and perform within five (5) days of notice from Vernon Parish Police Jury. 6. Asphalt Grinding: labor and equipment to grind up asphalt/3-shot roads, 6"-12" deep. Price per square yard, from January 1, 2024 to December 31, 2024. Contractor to respond and perform within five (5) days of notice from Vernon Parish Police Jury.

Post-Bid

Roads / Highways

$400,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
44
Bidding Soon
612
All Active Projects
313
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 25, 2024

February 26, 2024

December 31, 2024

img_map_placeholder

Multiple Locations, Leesville, LA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.