BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for an educational facility in Rancho San Diego, California. Completed plans call for site work for a educational facility.

Discrepancies in, and/or omissions from the plans, specifications or other contract documents or questions as to their meaning shall be immediately brought to the attention of the district by submission of a written request for an interpretation or correction to the district. Such submission, if any, must be sent to the Purchasing Department by emailing Jeff Johnson at jefjohnson@powayusd.com no later than 11:00am on January 25, 2024. SCOPE OF WORK. The Contractor shall perform all Work within the time stipulated in the Contract and shall provide all labor, materials, equipment, tools, utility services, and transportation to complete all of the Work required in strict compliance with the Contract Documents as specified in Article 5 below for the following Project: BID 2024-23 POUR-IN-PLACE SURFACE REPLACEMENTS The Contractor and its surety shall be liable to the District for any damages arising as a result of the Contractor's failure to comply with this obligation. SCOPE OF WORK NOTES: 1. Contractors shall be responsible for all material and equipment storage, transportation, etc., as necessary to perform the scope of work. 2. All floors and walls shall be protected properly from any damages, scratches, defects, etc. Contractor will be responsible for all needed restoration and/or repairs/replacement in order to bring back to the original pre-construction conditions, if are being affected by the contractor's performance. The contractor is strongly recommended to document all existing conditions prior to starting any activity and notify the District's representative regarding any existing damages or defects immediately, by email (including photos). 3. All light fixtures, their hanging devices, light bulbs, wiring, and conduits shall be protected in place. The contractor will be responsible for replacing damaged and / or defective parts with new, if occur because of the contractor's performance. 4. The Contractor shall complete contract scope of work within contract time period, with a final completion date of August 16th, 2024. The contractor shall provide sufficient labor, material, and equipment to complete the scope of work by or before the above date. 5. The Contractor shall assign a superintendent during the Contractor's performance. The Contractor's workers are not allowed to perform without the superintendent onsite. 6. If the contractor finds surfaces which are in question as to disposition, he is to report his findings to the District's inspector immediately for direction. 7. Contractor to provide submittals for specified products or substitutions as follows: a. Product Data: Provide data on specified products, describing physical and performance characteristics; sizes, patterns, thickness, and colors available. b. Samples: Submit color sheet of available color selections. At District's request, provide physical samples illustrating color and pattern for each floor material for each color specified. c. Manufacturer's Installation Instructions: Indicate special procedures. d. Manufacturer Warranty. e. Maintenance Data: Include maintenance procedures, recommended maintenance materials, procedures for stain removal, repairing surface, and suggested schedule for cleaning.

Award

Educational

$518,168.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
261
Active Projects
121
Bidding Soon
1,619
All Active Projects
797
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 8, 2024

March 8, 2024

img_map_placeholder

Multiple Locations, Rancho San Diego, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.