This is a service / maintenance or supply contract in Clemson, South Carolina. Contact the soliciting agency for additional information.
The proposed work consists of dredging approximately 75,000 cubic yards (cy) of material from the Major Canal on a 5-to-7 year maintenance cycle. Approximately 25,000 cy of material will be dredged during one (1) dredging event, for a total of 75,000 cy of material over the course of three (3) dredging events. The dredging area encompasses approximately 20 acres within the existing Major Canal. Dredged material will be removed by hydraulic dredge and pumped to the Horry County-owned confined disposal facility (CDF 320, Tidewater Disposal Basin) near Tidewater Plantation adjacent to the Atlantic Intracoastal Waterway (AIWW). The proposed width of the dredge path in Major Canal will range from approximately 85 feet to 185 feet. The proposed minimum required dredge depth is -5.0 feet mean low water (MLW); for a maximum total proposed depth of up to -6.0 MLW. Dredge side slopes will be 4(h) :1(v). The proposed dredging will be accomplished with a small (8" -to- I4") hydraulic basket cutterhead, swinging ladder, self-propelled dredge. Dredges of this type generally have three spuds, one of which is used to push the dredge forward to advance into the project cut. The dredge will operate within the footprint of the project. The dredge pipeline, which will consist of high-density polyethylene (HDPE), will either be rafted to the site in 500-foot lengths or may be trucked to the Tidewater Confined Disposal Facility (CDF) in approximately 40-foot lengths and fused into 400-to-500-footlong sections. A flange will be fused to each end. At high tide, sections will be floated into position and the flanges bolted together to form a continuous pipeline from Major Canal in the vicinity of Cherry Grove to the Tidewater CDF. Weights and anchors and/or temporary pilings will be required to secure the pipeline along the banks of Major Canal and along the dredge pipeline route in House Creek en route to the transition from the water to the upland pipeline route. It is approximately 18,300 feet distance from the farthest end of Major Canal to the discharge location at the Tidewater CDF. It is anticipated that one or two booster pumps may be required to pump the material to the Tidewater CDF. Prior to commencement of dredging, old boards, trash, etc. will be removed from the spillway structure and riser boards reinstalled to provide 2-to-3 feet of ponding at the outlet structure. Once dredging operations commence, the solids will settle out and be retained in the CDF. Excess water will be controlled to ensure that only clean, clear water is released through the spillway outlet structure. Once dredging operations have been completed, an aggressive program will be pursued to dewater and dry the material and prepare it for removal from the CDF. Final removal and relocation of the material will be completed in accordance with the Department of the Army Dredging Permit, and the Horry County Consent Agreements. Once the Tidewater CDF is restored to pre-disposal conditions, a survey will be conducted and submitted to the Corps and Horry County with a request for final inspection and release of Major Canal Dredging (for City of North Myrtle Beach) from the Consent Agreements.
Post-Bid
Water / Sewer
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 22, 2024
March 8, 2024
Multiple Locations, Clemson, SC
Related To This Project
Clemson, SC
Bid Date: Jan 23 2024
Clemson, SC
Bid Date: Jan 22 2024
Clemson, SC
Bid Date: Feb 15 2024
Clemson, SC
Bid Date: Feb 15 2024
Clemson, SC
--
Clemson, SC
--
Clemson, SC
Bid Date: Dec 17 2024
Clemson, SC
Bid Date: Dec 17 2023
Clemson, SC
Bid Date: Jan 30 2024
Clemson, SC
Bid Date: Jan 25 2024
Clemson, SC
Bid Date: Jan 25 2024
Clemson, SC
--
Clemson, SC
Bid Date: Dec 18 2023
Clemson, SC
Bid Date: Dec 19 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.