Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 21, 2024 at 7:00 PM

Updated February 22, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Clayton, Ohio. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Wenger Road Bridge Reconstruction Project Pursuant to Section 153.54, et seq. of the Ohio Revised Code, the Bidder shall submit a BID GUARANTY in the form of either: a) A bond for the full amount of the bid, conditioned that, if the bid is accepted, the bidder after the awarding or the recommendation for awarding the contract will enter into a proper contract based upon the bid; (FAXED COPIES ARE UNACCEPTABLE); or, b) A certified check, cashier's check, electronic bid bond or letter of credit pursuant to Chapter 1305, Ohio Revised Code, in the amount of TEN PERCENT (10%) of the bid. If a TEN PERCENT (10%) GUARANTY is submitted, provided that if the bid is accepted, the bidder will, after the awarding or recommendation for awarding the contract, enter into a proper contract, and indemnify the County against all damage suffered by failure to perform the contract by supplying a performance bond in accordance with Section 153.54(2), et seq. of the Ohio Revised Code for the FULL AMOUNT OF THE CONTRACT. Only those contractors which are currently pre-qualified in the proper work type(s) by the Ohio Department of Transportation will be eligible to submit bids for the construction of this project. A bidder must possess work types equal to at least 50% of the total amount of the submitted bid price.

Award

Bridges / Tunnels

$417,126.00

Public - City

Demolition, New Construction, Paving, Site Work

68

3

6

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
288
Active Projects
139
Bidding Soon
2,381
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 24, 2024

February 26, 2024

Project location map

Wenger Rd, Clayton, OH


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed