BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving, new construction and renovation of a mixed-use development in Choctaw, Oklahoma. Completed plans call for the construction of a pre-engineered storage facility; for site work for a pre-engineered storage facility; for the renovation of a pre-engineered storage facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

New 54,700 SF high school football/soccer multipurpose facility, training center, locker rooms, team rooms, offices. PEMB, TPO Roofing, turf field, metal stud framing, metal wall panels, brick veneer, and EIFS. Located on Choctaw Nicoma Park High School Campus. As of January 29, 2024, per Addendum 2, all bid packages except Bid Packages 2, 3a, and 3b will bid on January 30, 2024. Those excluded bid packages are bidding separately on February 2, 2024. Please see related project. Following Bid Packages: 1. Demolition 2. Earthwork 3. Soil Nail Wall / Aggregate Piers 4. Utilities 5. Pavement - Exterior Paving / Sidewalks 6. Segmental Retaining Walls 7. Concrete - Foundation / Walls / Slab 8. Masonry 9. Pre-engineered Metal Building Fabrication 10. Pre-engineered Metal Building Insulation 11. Structural Steel Fabrication 12. Structural Steel Erection (Including Pemb) 13. Metal Panel Facade 14. General Trades 15. Millwork / Counters / Windowsills 16. Waterproofing / Caulking / Joint Sealants 17. Roofing / Elevated Paver System 18. Doors / Frames / Hardware (Materials Only) 19. Overhead Doors / Coiling Counters Doors 20. Eifs 21. Glazing / Aluminum Storefront / Architectural Railings 22. Framing / Drywall / Ceilings 23. Tape / Bed / Painting 24. Flooring (Resilient / Soft / Athletic / Ceramic) 25. Sports Field 26. Division 10 Specialties (Materials Only) 27. Signage / Applied Vinyl Graphics 28. Lockers 29. Expansion Joint Systems 30. Window Shades 31. Sports Equipment / Wall Padding 32. Equipment (Laundry / Appliances) 33. Elevator 34. Fire Suppression Systems 35. Plumbing Systems 36. Hvac Systems 37. Electrical Systems / Lighting 38. Fire Alarm Systems 39. Av Systems Part 1 General Bidding Requirements a. It is the Intent of the Following to Describe the Scope of Work Included in Each Bid Package. The Bid Shall Include All the Requirements in the Specification Sections Listed Unless Specifically Excluded Below. If the Scope of Work Includes Labor, Then the Successful Bidders Must Provide General Liability, Auto and Workers Compensation With Certificate Listing Additional Insured and Waiver of Subrogation in Favor of the Owner, Architect, Construction Manager and Any Others Requested at Time of Contract Issuance. C. If the Scope of Work is to Only Supply Material, Then the Successful Bidders Must Include All Labor, Materials, Services and Incidentals Required for Complete Fabrication, Manufacture and Delivery to the Project Site the Materials Included in the Designated Specification Sections and Drawings. D. If Any Bidder is Unclear as to the Scope of Work Required, Contact the Architect/construction Manager Prior to Bidding. Prior Approval is Required for All Bid Packages. Do Not Modify, Add, or Delete From Scope of Work or You Risk the Owner Setting Your Bid Aside. E. The Construction Manager May Bid on Any or Any Combination of Bid Packages, but Will Declare Such Information at the Pre-bid Conference. . Owner Reserves Option to Award or Reject Any and All Bid Packages. G. If the Bid is in Excess of $50,000.00 Dollars, Payment and Performance Bonds Each in the Amount of 100% of the Contract Amount Covering Faithful Performance of the Contract, and Payment of All Obligations Arising There Under, Will Be Required by the Owner. A Warranty Bond in the Amount of 100% of the Contact Amount Covering Defective Workmanship and Materials for a Period of One Year After Acceptance of the Project Will Be Required. Premiums for the Performance, Payment and Warranty Bonds Are Included in This Proposal. It is Further Understood That, if Accepted by the Owner, This Bid Becomes a Part of the Contract Documents Upon Signing of the Contract, and Failure to Comply With Any Part of This Bid Will Be Taken as Failure to Comply With the Contract Documents, and Will Be Just Cause for Rejection of Any or All of the Work. H. Accompanying the Bid is Either (1) a Certified Check, (2) a Cashier's Check, or (3) a Bidder's Surety Bond Made Payable to the Owner for Not Less Than 5% of the Amount Submitted Herein. It is Understood That the Check or Bond Will Be Returned to the Bidder, Except That in the Event of the Owner's Acceptance of This Bid, and the Bidder Fails to Execute a Contract and File Performance and Materials and Payment Bonds Within Ten Days of the Date of the Owner's Acceptance; Then, in That Event, the Bidder's Check or Bond Will Become Property of the Owner Because of the Failure of the Bidder to Comply With the Specified Requirement. Bid Bond Must Be Accompanied by Bonding Agent's Power-of-attorney. I. Out-of-state Subcontractors to Provide Proof of Registration With the State of Oklahoma Upon Request Per State Law J. Bids Shall Include All of the Requirements of the Specification Sections Listed Unless Specifically Excluded Below. K. Each Bid Shall Include Removal of All Trash and Debris Created by Each Bidder's Work. Each Bid Shall Include Delivery / Loading/ and Unloading of Materials. L. This Work Will Be Completed at Existing Structures, Site Survey is Strongly Recommended. It is Likely Class and/or Students Will Be Present During Construction, Be Prepared for Possible Shifting of Activities Based Upon Operational Needs of the School. M. This Project is Tax Exempt. N. Bid Packages Are Designed to Be Bid Separately. Combination of Bid Packages Will Be Received, but Owner Reserves the Option to Award or Reject Regardless of Pricing Implications. O. Multiple Mobilizations Are Potentially Required, Based Upon Schedules of Work. P. Change Orders Will Only Allow a Maximum of Fifteen Percent (15%) for Overhead and Profit The Owner Reserves the Right to Reject Any or All Bids. Although a firm timeline has not been confirmed, construction is not expected to start prior to March 2024.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$5,000,000.00

Public - City

New Construction, Paving, Renovation, Site Work

106

38

101

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
65
Bidding Soon
586
All Active Projects
252
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 30, 2024

March 25, 2024

img_map_placeholder

12880 NE 10th St, Choctaw, OK


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.