BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a civil project in Agoura Hills, California. Completed plans call for site work for a development; road / highway; for paving for a road / highway; and water / sewer project.

Questions Due- Tuesday, April 16, 2024, 5:00 pm Bid is Rejected. The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. Work includes but is not limited to overbuilding an existing LACFCD concrete-lined runoff channel with CIDH piles and pre-cast voided slab beams to create the Greenway. Additionally, the Project includes undergrounding of existing SCE, AT&T and Crown Castle utilities, roadway improvements, potable waterline realignment, drainage improvements, landscaping, retaining wall construction, and private/public construction and interface improvements. The full scope of work is more specifically described in the Contract Documents. This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the City Engineer. Type of Award - Lump Sum License Requirements - CLASS "A" CONTRACTOR LICENSE Liquidated Damages - $1500 FOR EACH DAY WORK REMAINS INCOMPLETE Project Duration - 375 WORKING DAYS Bid Bond - 10.00% Payment Bond - 100.00% Performance Bond - 100.00% Online Q&A - Yes Q&A Deadline - 01/18/2024 5:00 PM (PST) The scope of work includes, but is not limited to the following: Constructing a continuous self-supporting structural cover to bridge the existing Cheseboro Canyon LACFCD runoff channel to create the Greenway parallel to Agoura Road, between the intersections of Cornell Road to the Whizins Shopping Center driveway closest to Cornell Road, south of the Ventura Freeway (US Route 101). The associated construction work will include earth work, paving, landscaping, drainage facilities, retaining walls, CIDH piles, erecting of pre-cast concrete voided slab. Site work includes hardscape, DG and decorative concrete pathways, curb, gutter and sidewalks, lighting, roadway improvements including grind and ARHM overlay of adjacent roadways, striping, and signage, installation of public art, environmental mitigation measures, public/private construction interface improvements, and other miscellaneous work as required by the plans and specifications. Coordinated construction efforts with the Contractor will be made with adjacent undergrounding of SCE, AT&T and Crowncastle overhead lines as well as LVMWD Pump Station Building improvements. Site improvements to the LVMWD property will constructed with the Greenway Project scope of work.

Award

Conservation and Development

$14,710,745.00

Public - City

Paving, Site Work

103

13

12

6

Subscribe For Documents

97 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
161
Active Projects
83
Bidding Soon
1,858
All Active Projects
811
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2024

July 8, 2024

img_map_placeholder

Multiple Locations, Agoura Hills, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.