Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 10, 2024 at 7:00 PM
Updated February 11, 2024
Site work and paving for a bridge / tunnel in Rogers City, Michigan. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Bridge rehabilitation including railing replacement, concrete beam repair and substructure patching on US-23 over Black Mallard River, Presque Isle County. Net classification required for this project is 525 N9-1A In addition to the above minimum prequalification requirement for prime contractors this project includes a subclassification of Fa. If the prime contractor is not prequalified in this subclassification it must use a prequalified subcontractor. This subcontractor must be designated prior to award of the contract to the confirmed low bidder. Control Sec Job No Federal No M 71073 219281A N/A MI DOT - 2402 017 - Bridge Rehabilitation Including Railing Replacement, Concrete Beam Repair and Substructure Patching on Us-23 Bridge rehabilitation including railing replacement, concrete beam repair and substructure patching on US-23 over Black Mallard River, Presque Isle County.
Award
Bridges / Tunnels
$562,216.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 2, 2024
May 28, 2024
US-23, Rogers City, MI
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
