Published February 3, 2025 at 7:00 PM

Updated February 4, 2025

Site work and new construction of a mixed-use development in Springfield, Vermont. Design plans call for the construction of a educational facility; and for site work for a educational facility.

Per the owner, as of February 3, 2025, some elements of work have begun and others will be bid in the second quarter of 2025. The purpose of this Request for Qualifications and Proposals (RFQ/P) is to identify teams interested in supporting this project, providing a framework for fair evaluation based on the criteria listed herein, and select the best match to meet the project needs. Question Deadline: 01/12/2024,Last day for Requests for Information. Responses to all RFIs will be provided to all parties within 48 hours of receipt. The method of Contractor Selection has not been Determined at this time. SRDC wants to begin implementation of Phase I early in 2024 to comply with various grant requirements and to aid in the raising of funds for future phases. Phase I allows SRDC to bring the property into environmental and code compliance while expending the grant funds that it has been awarded to date. Teams providing the most efficient path to this goal will be prioritized. 1) Teams should review available plans and performance specifications and propose in a short narrative how they would prioritize the development of bid packages based on plans in hand. For example, the Owner currently feels that the following could be bid based on existing information: o Exterior civil/site package o Asbestos Remediation (interior) o New electrical service (design-build) 2) A performance specification for sprinklers suitable for bid is available for design-build bid. However, a demolition plan must be developed and implemented before it can be fully installed to serve the intended building uses. The proposal response should outline the resources and timing required to accomplish this task. 3) One or more visits with state code officials will be required to coordinate egress path and fire alarm improvements required to bring the building into code compliance. 4) A complete architectural design services for the installation of a new elevator (prepare and construct a shaft, install elevator) as a stand-alone project. 5) Provide building envelope and energy modeling services to identify base load building needs. Prepare a performance spec sufficient for design-build bidding of electric boilers to support the base building load. Springfield Regional Development Corporation (SRDC/Owner) invites qualified architectural professionals to submit qualifications for a team (Team) to support the successful design coordination, bidding, and construction oversight of Phase One of the adaptive reuse of the former Park Street School in Springfield, VT as the "Black River Innovation Campus" (BRIC). The project requirements are summarized in this document. The successful team will have (1) direct experience in the adaptive reuse of historic buildings (preferably within Vermont), (2) be capable of providing and coordinating the services described herein, (3) demonstrate capacity and willingness to meet the schedule described. o SRDC reserves the right to modify the proposal, reject any or all bids, and reserves the right to cancel this process without moving forward with any candidate. o This RFQ/RFP document is not an offer to enter into a contract. o No compensation is being offered to any candidate in exchange for assembling a response to this RFP. o The proposal is for an indefinite engagement that may be modified or terminated at any time in the sole discretion of SRDC. The Owner reserves the right to modify the scope of the work awarded to reflect the evolving requirements of the various state and federal grant agreements being finalized to fund this project in its sole discretion. In the event such adjustments are required the Owner understands and appreciates that certain schedule and cost impacts will occur.

Design

Educational

$550,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
440
Active Projects
197
Bidding Soon
2,972
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2025

Project location map

60 Park St, Springfield, VT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.