Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 21, 2024 at 8:00 PM
Updated March 22, 2024
Site work and new construction of a mixed-use development in Akeley, Minnesota. Completed plans call for site work for a pre-engineered storage facility; water / sewer project; and for the construction of a pre-engineered storage facility.
**As of March 11,2024 this project has not yet been awarded. The project is expected to be awarded in the next two weeks.** Site Address: 13885 MN-64, Akeley, MN 56433 Est. Value: $ 1,000,000.00 Est. Completion Date: March 31, 2025 The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Site preparation, excavation, grading, and utilities. 2. Concrete foundations, slab on grade concrete floor, reinforcement. 3. Pre-engineered metal building erection & framing. 4. Insulated metal panel installation, door & window installation, membrane roofing. 5. Mechanical & electrical work associated with building systems. This project is Targeted Group (TG) Economically Disadvantaged (ED) Veteran-Owned preference and has a 4% (TG/ED/VO) subcontracting goal established. Alternate 1: Provide a 10'-0" wide concrete connection from the west overhead door to the existing sorting facility as indicated on the drawings. Alternate 2: Install exterior enclosure for seeding reception space. Including 3" insulated metal panels, additional framing around doors and windows, two overhead doors, two swing doors, windows, bollards, and mechanical & electrical systems as indicated on the drawings. Substantial Completion date is 290 days from notice to proceed. Final Completion date is 320 days from notice to proceed. Project B2302453 All questions should be submitted no later than January 16, by 2:00pm CST
Award
Warehouse / Distribution - Pre-Engineered Storage Building
$1,677,627.00
Public - State/Provincial
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 1, 2024
April 3, 2024
13885 MN-64, Akeley, MN
Related To This Project
Akeley, MN
Bid Date: May 16 2024
Akeley, MN
Bid Date: Jun 11 2025
Akeley, MN
Bid Date: Nov 03 2025
Akeley, MN
Bid Date: Jun 25 2021
Akeley, MN
Bid Date: Jul 17 2023
Akeley, MN
Bid Date: Jul 17 2023
Akeley, MN
Bid Date: Mar 23 2023
Akeley, MN
--
Akeley, MN
Bid Date: Mar 24 2023
Prior Lake, MN
Bid Date: Feb 01 2024
Lakeville, MN
Bid Date: Jan 25 2024
Madelia, MN
Bid Date: Jan 25 2024
Dodge Center, MN
Bid Date: Jan 23 2024
Soudan, MN
Bid Date: Jan 30 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
