BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Kirkland, Washington. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Progress continues on an ambitious project that will transform the 100th Avenue Northeast corridor into a safer, more efficient street for all traveling modes, including walking, driving, riding transit and bicycles. In this first phase, the City is building separated sidewalks and elevated bicycle lanes along both sides of the corridor, between Northeast 139th and 145th streets. The first phase will also improve traffic flow by creating two more vehicular lanes and optimizing 100th Avenue Northeast’s intersections with Northeast 139th, 145th streets and Simonds Road. In 2020, the City of Kirkland completed one of the first phase's most ambitious tasks: installation of a new 10-foot-wide, eight-foot-tall culvert that will accommodate those extra two lanes of traffic and, at the same time, is providing access to a mile of upstream habitat for trout and salmon. Many of the improvements derive from the 100th Avenue Northeast Study(PDF, 331KB) The City's Public Works staff hired the consulting firm of Concord Engineering to work with the community on a study of the 100th Avenue Northeast Corridor. The Study analyzed safety improvements for pedestrians, general travel lane configurations, and associated environmental issues between Northeast 132nd and Northeast 145th Streets. Other considerations will include traffic flow, and future anticipated growth. The final product from the Study will be used as the basis for future grant funding opportunities. As of February 16, 2024, the project is currently under construction. However, the firm construction timelines have not been released.

Under Construction

Roads / Highways

$3,100,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
49
Bidding Soon
927
All Active Projects
345
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2023

img_map_placeholder

100th Ave NE, Kirkland, WA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.